Franklin Regional Council Of Governments
Special DistrictMA
Posted
Aug 12, 2026
Sep 15, 2026
Cummington Water Dept. - Control System Upgrade RFP
Control System Upgrade.
Description: Project involves upgrading of the aeration system which includes but is not limited to replacement of aeration equipment, refurbishment of aerator weather hoods, and cleaning of oxidation ditch channels.
City · WI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalThese related opportunities are still open for bidding.
Franklin Regional Council Of Governments
Special DistrictMA
Posted
Aug 12, 2026
Sep 15, 2026
Control System Upgrade.
CountyMD
Posted
Aug 5, 2026
Sep 16, 2026
Harford County's Department of Public Works—Water and Sewer is soliciting bids for removal and replacement of the existing Soda Ash System processing equipment and associated loop piping at the Abingdon Water Treatment Plant. The open IFB was posted on August 5, 2026, and bids are due September 16, 2026, at 1:00 PM EDT. This is a local government construction procurement for a water-treatment upgrade, not a grant program.
CityGA
Posted
Aug 10, 2026
Sep 17, 2026
The City of Social Circle, Georgia is seeking contractors for significant upgrades to its Little River Water Pollution Control Plant and sewerage system. Contract 1 covers approximately 3,600 linear feet of DIP and PVC sewer with manholes, jack-and-bore work, rock excavation, clearing, and erosion and sediment controls, while Contract 2 covers new treatment-process and support facilities including aeration basins, clarifiers, tertiary filters, ultraviolet disinfection, pumping, chemical feed, control, digestion, and sludge-dewatering facilities. The Georgia Procurement Registry identifies this as a construction/public-works procurement rather than a grant, requiring a State of Georgia Utility Contractor License and a state Utility Manager certificate holder, with listed completion periods of 270, 480, and 540 days.
CityGA
Posted
Aug 10, 2026
Sep 17, 2026
The City of Social Circle, Georgia is seeking contractors for significant upgrades to its Little River Water Pollution Control Plant and sewerage system. Contract 1 covers approximately 3,600 linear feet of DIP and PVC sewer with manholes, jack-and-bore work, rock excavation, clearing, and erosion and sediment controls, while Contract 2 covers new treatment-process and support facilities including aeration basins, clarifiers, tertiary filters, ultraviolet disinfection, pumping, chemical feed, control, digestion, and sludge-dewatering facilities. The Georgia Procurement Registry identifies this as a construction/public-works procurement rather than a grant, requiring a State of Georgia Utility Contractor License and a state Utility Manager certificate holder, with listed completion periods of 270, 480, and 540 days.
Decision makers connected to this RFP from City of Hartford.