Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Box culvert replacement project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replacement of County Road 31 (Middaugh Hill Road) Culvert over Tributary to Gordon Brook.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
Close: Feb 12, 2026
Replacement of County Road 31 (Middaugh Hill Road) Culvert over Tributary to Gordon Brook.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for the replacement of Mitchell Brook Road Culvert No. 9 with two new culverts: a 30-inch corrugated metal pipe and an 87-inch x 63-inch pipe arch, including all necessary excavation and site work.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Procurement for the replacement of Mitchell Brook Road Culvert No. 9 with two new culverts: a 30-inch corrugated metal pipe and an 87-inch x 63-inch pipe arch, including all necessary excavation and site work.
AvailableWork includes the replacement of a culvert, approx. 1300 feet. The existing dual elliptical pipe culvert will be replaced with a new, 4-sided box culvert. Additional work consists of watermain replacement and roadway approach reconstruction. An off-site detour will be utilized for the duration of construction.
Posted Date
Jan 9, 2026
Due Date
Feb 3, 2026
Release: Jan 9, 2026
Close: Feb 3, 2026
Work includes the replacement of a culvert, approx. 1300 feet. The existing dual elliptical pipe culvert will be replaced with a new, 4-sided box culvert. Additional work consists of watermain replacement and roadway approach reconstruction. An off-site detour will be utilized for the duration of construction.
AvailableRelease: Jan 22, 2026
Close: Feb 6, 2026
Hartland Center Road Culvert Replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →