Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform gymnasium floor renovation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide construction services for gymnasium renovation project phase iii.
Posted Date
Jan 15, 2026
Due Date
Feb 17, 2026
Release: Jan 15, 2026
Close: Feb 17, 2026
Provide construction services for gymnasium renovation project phase iii.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Housing Authority of the City of Brownsville (HACB) issued IFB 25-004: Floor Renovation Project for Tropical Gardens Apartments (58 occupied public housing units) to provide complete, code-compliant flooring removal and installation while minimizing resident disruption. Scope includes removal and disposal of existing flooring and trim, subfloor preparation, application of underlayment and installation of Shaw resilient flooring and transition strips, and reinstallation or replacement of baseboards. Period of performance is 90 calendar days from commencement and bidders must provide a project schedule, cost breakdown, bid bond, and required certifications.
Posted Date
Jan 2, 2026
Due Date
Feb 12, 2026
Release: Jan 2, 2026
Close: Feb 12, 2026
The Housing Authority of the City of Brownsville (HACB) issued IFB 25-004: Floor Renovation Project for Tropical Gardens Apartments (58 occupied public housing units) to provide complete, code-compliant flooring removal and installation while minimizing resident disruption. Scope includes removal and disposal of existing flooring and trim, subfloor preparation, application of underlayment and installation of Shaw resilient flooring and transition strips, and reinstallation or replacement of baseboards. Period of performance is 90 calendar days from commencement and bidders must provide a project schedule, cost breakdown, bid bond, and required certifications.
AvailableHigh school gymnasium renovation.
Posted Date
Jan 8, 2026
Due Date
Feb 12, 2026
Release: Jan 8, 2026
Close: Feb 12, 2026
High school gymnasium renovation.
AvailableThe work to be performed shall consist of furnishing all labor, materials, tools, and equipment necessary to complete the removal of the existing resilient gymnasium wood flooring and the installation of new wood flooring to match the existing system. Work includes surface preparation, sanding, and finishing of the new floor; application of all required game lines, striping, lettering, and the school logo in accordance with school standards; and final sealing, waxing, and buffing of the completed gymnasium floor to ensure a uniform, durable finish.
Posted Date
Jan 20, 2026
Due Date
Feb 11, 2026
Release: Jan 20, 2026
Close: Feb 11, 2026
The work to be performed shall consist of furnishing all labor, materials, tools, and equipment necessary to complete the removal of the existing resilient gymnasium wood flooring and the installation of new wood flooring to match the existing system. Work includes surface preparation, sanding, and finishing of the new floor; application of all required game lines, striping, lettering, and the school logo in accordance with school standards; and final sealing, waxing, and buffing of the completed gymnasium floor to ensure a uniform, durable finish.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →