General Services Administration
FederalDC
Jul 14, 2026
Closes
Aug 27, 2026
Design-Build Services for IRS Fire Alarm Modernization Project RFP
Construction contractor to replace and modernize the emergency voice fire alarm system.
Description: Replace equipment for two existing elevators.
SchoolDistrict · SC, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
General Services Administration
FederalDC
Jul 14, 2026
Closes
Aug 27, 2026
Construction contractor to replace and modernize the emergency voice fire alarm system.
Los Angeles Unified School District
School DistrictCA
Aug 11, 2026
Closes
Sep 29, 2026
LAUSD posted an open Construction RFQ-Prequal for “LAUSD | NORMANDIE AVE ES (ALTERNATIVE DESIGN BUILD) - SEISMIC MODERNIZATION PROJECT.” The RAMP record marks the opportunity Open and identifies LAUSD as the department/buyer. The posting data show a bid-post timestamp of 2026-08-11T21:00:00.000 and a bid due time of 9/29/2026, 06:00 PM GMT, and the detail page lists no primary PDF, DOCX, or PPT attachment.
CountyIN
Aug 8, 2026
Closes
Sep 8, 2026
Work include replacement of existing hoisting machinery, motor, governor, rope gripper, hoist ropes, shackles, and associated elevator operating equipment. Replacement of door operators, hall stations, car operating panels, positioning systems, traveling cables, and related elevator controls. Installation of new hall position indicators, car top railings, inspection stations, ventilation equipment, and associated elevator modernization components. Electrical improvements including new disconnects, lighting, receptacles, smoke detection devices, fire alarm interface components, and communication cabling. Hvac improvements including installation of a dedicated machine room split system. Civil and masonry improvements including machine room construction, fire-rated door installation, and related structural modifications
Aug 17, 2026
Closes
Sep 9, 2026
The work generally includes the renovation in a design build format, for the demolition of the bell tower and other exterior elements to be capped and made watertight and airtight from exterior conditions using acceptable means and construction to obtain a final product.
Procurement and program contacts connected to South Carolina Governor's School for Science and Mathematics.