Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Greenlawn water district - wellhead treatment for removal of pfa's & voc's at well no's 10 & 15 - plumbing construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project will include construction of a new treatment building, a new arsenic treatment system; construction of water lines and connections to the existing well house piping; construction of concrete drying beds and an unlined infiltration basin; and installation of electrical equipment and controls upgrades.
Posted Date
Jan 18, 2026
Due Date
Feb 26, 2026
Release: Jan 18, 2026
Close: Feb 26, 2026
Project will include construction of a new treatment building, a new arsenic treatment system; construction of water lines and connections to the existing well house piping; construction of concrete drying beds and an unlined infiltration basin; and installation of electrical equipment and controls upgrades.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contract No. 1 - Wellhead 9 PFAS treatment facility The Project is comprised of two (2) primary components as follows: PFAS Facility: Work generally includes construction of a new 27-foot by 36-foot treatment facility housing two 12-ft diameter, 40,000-pound GAC vessels for the removal of PFAS. The proposed equipment would be fully housed within a new modular building. The building housing the GAC vessels will be located adjacent to the existing Well 9 building. The building will be wood framing studs with fiber cement lap siding provided by a pre-engineered manufacturer. Interior process piping shall consist of ductile iron and PVC and ranges in size from 2" to 12", including butterfly valves with both manual and electric actuators. Site Work: Work shall also include construction required outside of the physical building structure or facility including but not limited to raw water influent lines, finished water effluent piping, other site utilities, site grading, new sanitary manhole, site driveways, curb and gutter replacement, and paving, additional site electrical components, and landscape improvements associated with the project.
Posted Date
Jan 7, 2026
Due Date
Feb 10, 2026
Release: Jan 7, 2026
Close: Feb 10, 2026
Contract No. 1 - Wellhead 9 PFAS treatment facility The Project is comprised of two (2) primary components as follows: PFAS Facility: Work generally includes construction of a new 27-foot by 36-foot treatment facility housing two 12-ft diameter, 40,000-pound GAC vessels for the removal of PFAS. The proposed equipment would be fully housed within a new modular building. The building housing the GAC vessels will be located adjacent to the existing Well 9 building. The building will be wood framing studs with fiber cement lap siding provided by a pre-engineered manufacturer. Interior process piping shall consist of ductile iron and PVC and ranges in size from 2" to 12", including butterfly valves with both manual and electric actuators. Site Work: Work shall also include construction required outside of the physical building structure or facility including but not limited to raw water influent lines, finished water effluent piping, other site utilities, site grading, new sanitary manhole, site driveways, curb and gutter replacement, and paving, additional site electrical components, and landscape improvements associated with the project.
AvailableProvide Glass - Lower, Non-egress, Tinted, Curved 4mm Temp 18% Gray, #6 C/S and #7 S/S M.
Posted Date
Jan 27, 2026
Due Date
Feb 3, 2026
Release: Jan 27, 2026
Close: Feb 3, 2026
Provide Glass - Lower, Non-egress, Tinted, Curved 4mm Temp 18% Gray, #6 C/S and #7 S/S M.
AvailableWork includes installation of a water supply well and all associated appurtenances including all metering, valves, and piping.
Posted Date
Jan 28, 2026
Due Date
Feb 19, 2026
Release: Jan 28, 2026
Close: Feb 19, 2026
Work includes installation of a water supply well and all associated appurtenances including all metering, valves, and piping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →