Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This is a solicitation for construction/engineering work to interconnect the Great Barrington Fire District with the Housatonic Water Works Company at Christian Hill Road in Great Barrington, MA. A non-mandatory pre-bid conference was scheduled for 2026-01-28 at 10:00 AM and sub-bids for painting, HVAC, and electrical are due 2026-02-17 at 4:00 PM. The general bid closing date is 2026-02-25 and bid document access requires registration on the buyer's site.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes : 450 LF abandon existing 6" petersburg water main; 7 EA connect existing residential warter meters to new 8" water main; 1,100 SF saw cut and demolition of existing pavement; 3,100 SF pavement restoration; 510 LF erosion & sediment control; 2,355 SF grading and seeding; see attached file.
Posted Date
Dec 19, 2025
Due Date
Jan 13, 2026
Release: Dec 19, 2025
Close: Jan 13, 2026
Work includes : 450 LF abandon existing 6" petersburg water main; 7 EA connect existing residential warter meters to new 8" water main; 1,100 SF saw cut and demolition of existing pavement; 3,100 SF pavement restoration; 510 LF erosion & sediment control; 2,355 SF grading and seeding; see attached file.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Accelerating Transmission System Interconnection Strategies (ATSIS).
Posted Date
Dec 29, 2025
Due Date
Jan 16, 2026
Release: Dec 29, 2025
Close: Jan 16, 2026
Accelerating Transmission System Interconnection Strategies (ATSIS).
AvailableDistributed Energy Resources Interconnection Solutions Collaboratives (DERISC).
Posted Date
Dec 29, 2025
Due Date
Jan 16, 2026
Release: Dec 29, 2025
Close: Jan 16, 2026
Distributed Energy Resources Interconnection Solutions Collaboratives (DERISC).
AvailableDixie Electric Power Association is seeking applications for the interconnection of distributed generation systems, including solar and wind, up to 2 MW (2,000 kW) for members to connect to their distribution system.
Posted Date
Jan 1, 2022
Due Date
Dec 31, 2099
Release: Jan 1, 2022
Close: Dec 31, 2099
Dixie Electric Power Association is seeking applications for the interconnection of distributed generation systems, including solar and wind, up to 2 MW (2,000 kW) for members to connect to their distribution system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →