Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Accelerating Transmission System Interconnection Strategies (ATSIS).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Rocky Mount (NC) is soliciting informal bids from qualified engineering firms to perform a Solar Farm Interconnection Impact Study to assess system impacts, identify required upgrades, and ensure compliance with applicable standards. The work includes load-flow, short-circuit, voltage regulation, protection coordination, power quality evaluations, and a written PDF report with supporting calculations; the study must be completed within approximately 45–60 days after Notice to Proceed and has a not-to-exceed budget stated in the posting. The solicitation was posted on 2026-01-08 and is open with a response deadline of 2026-01-27.
Posted Date
Jan 8, 2026
Due Date
Jan 27, 2026
Release: Jan 8, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 27, 2026
The City of Rocky Mount (NC) is soliciting informal bids from qualified engineering firms to perform a Solar Farm Interconnection Impact Study to assess system impacts, identify required upgrades, and ensure compliance with applicable standards. The work includes load-flow, short-circuit, voltage regulation, protection coordination, power quality evaluations, and a written PDF report with supporting calculations; the study must be completed within approximately 45–60 days after Notice to Proceed and has a not-to-exceed budget stated in the posting. The solicitation was posted on 2026-01-08 and is open with a response deadline of 2026-01-27.
AvailableDixie Electric Power Association is seeking applications for the interconnection of distributed generation systems, including solar and wind, up to 2 MW (2,000 kW) for members to connect to their distribution system.
Posted Date
Jan 1, 2022
Due Date
Dec 31, 2099
Release: Jan 1, 2022
Close: Dec 31, 2099
Dixie Electric Power Association is seeking applications for the interconnection of distributed generation systems, including solar and wind, up to 2 MW (2,000 kW) for members to connect to their distribution system.
AvailableWork includes : 450 LF abandon existing 6" petersburg water main; 7 EA connect existing residential warter meters to new 8" water main; 1,100 SF saw cut and demolition of existing pavement; 3,100 SF pavement restoration; 510 LF erosion & sediment control; 2,355 SF grading and seeding; see attached file.
Posted Date
Dec 19, 2025
Due Date
Jan 13, 2026
Release: Dec 19, 2025
Close: Jan 13, 2026
Work includes : 450 LF abandon existing 6" petersburg water main; 7 EA connect existing residential warter meters to new 8" water main; 1,100 SF saw cut and demolition of existing pavement; 3,100 SF pavement restoration; 510 LF erosion & sediment control; 2,355 SF grading and seeding; see attached file.
AvailableProvide professional engineering services in support of updating the district's water treatment and transmission system master plan.
Posted Date
Oct 28, 2025
Due Date
Jan 29, 2026
Release: Oct 28, 2025
Close: Jan 29, 2026
Provide professional engineering services in support of updating the district's water treatment and transmission system master plan.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →