Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Dixie Electric Power Association is seeking applications for the interconnection of distributed generation systems, including solar and wind, up to 2 MW (2,000 kW) for members to connect to their distribution system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Distributed Energy Resources Interconnection Solutions Collaboratives (DERISC).
Posted Date
Dec 29, 2025
Due Date
Jan 16, 2026
Release: Dec 29, 2025
Close: Jan 16, 2026
Distributed Energy Resources Interconnection Solutions Collaboratives (DERISC).
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Accelerating Transmission System Interconnection Strategies (ATSIS).
Posted Date
Dec 29, 2025
Due Date
Jan 16, 2026
Release: Dec 29, 2025
Close: Jan 16, 2026
Accelerating Transmission System Interconnection Strategies (ATSIS).
AvailablePermanent abandonment of three existing connections. Work include Demolition, disposal, backfill, and compaction of existing interconnection piping, fittings, gate valves, concrete, and vaults; Saw-cut, remove, and replace AC paving, trench backfill and compaction, temporary paving and base material; Construct replacement of impacted sidewalk, curb, and gutter; Furnish and install 12" diameter double-blind flanged CML&C steel pipe spool. See outside link.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
Permanent abandonment of three existing connections. Work include Demolition, disposal, backfill, and compaction of existing interconnection piping, fittings, gate valves, concrete, and vaults; Saw-cut, remove, and replace AC paving, trench backfill and compaction, temporary paving and base material; Construct replacement of impacted sidewalk, curb, and gutter; Furnish and install 12" diameter double-blind flanged CML&C steel pipe spool. See outside link.
AvailableGrant funding for energy efficiency measures and distributed generation (DG) systems.
Posted Date
Jan 1, 2026
Due Date
Dec 31, 2026
Release: Jan 1, 2026
Close: Dec 31, 2026
Grant funding for energy efficiency measures and distributed generation (DG) systems.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.