Description: In general, the work consists of: installing a new 1,200-ton centrifugal chiller, new cooling towers, piping and pumps within East Chiller Plant. Work also includes installation of new exterior electrical yard along with new underground chilled water supply and return piping. Entire project area will be restored to original conditions.
StateAgency · WI, US
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
97 days before RFP
The Building Commission request sought authority to construct UW-La Crosse’s East Chiller Plant Replacement and Installation at an estimated total cost of $7,399,100, with bid opening planned for December 2025 and construction planned to start in April 2026.
13. UW-System -- 2023-25 Central Plants and Utility Distribution System Renovations Program -- Request the following: a) Authority to release $13,796,850 ($7,869,750 SEG REV, $4,394,100 PRSB and $1,533,000 PR-CASH) of the total $149,269,000 ($105,048,000 SEG REV, $41,008,000 PRSB, and $3,213,000 PR-CASH) allocation of the 2023-25 Central Plant and Utility…
State of Wisconsin Building Commission Meeting
Agenda packet · May 7, 2025
Agenda packet
97 days before RFP
The State Building Commission authorized $827,250 in February 2025 for design of UW-La Crosse’s East Chiller Plant Replacement and Installation.
UW-La Crosse -- East Chiller Plant Replacement and Installation (24D3M): Project Description and Justification: This project expands chilled water capacity at the East Plant by replacing the non-functioning chiller with a new chiller. Existing cooling towers will be removed and replaced along with associated condenser water pumps and piping. The exiting…
RFP published
Proposals due (44 days left)
Adjacent opportunities open for bidding right now.
StateWI
Posted
Nov 20, 2026
Jan 12, 2027
State of Wisconsin Building Commission Meeting
Agenda packet · May 7, 2025
The project involves removing existing water-cooled chillers, cooling towers, pumps, chemical-treatment equipment, piping, and controls. It calls for a new chilled-water system featuring air-cooled chillers and pumps with variable-frequency drives (VFDs). The work also includes new controls and associated piping.
CityIA
Posted
Nov 17, 2026
Dec 3, 2026
Project consists of removing and replacing the existing ammonia flooded shell and tube chiller and evaporative condenser at young ice arena. The project includes demolition, refrigeration equipment, piping, insulation, electrical, and related items.
Ohio Department of Rehabilitation and Correction
State AgencyOH
Posted
-
Nov 24, 2026
Provide hvac mechanical project involving chiller and condenser replacement.
CountyCO
Posted
Nov 20, 2026
Dec 21, 2026
Remove and replace the existing indoor 400amp 208V, 3PH, 4W, 3-pole, with solid neutral, UL Type 1, 300 series ASCO Automatic Transfer Switch (ATS), associated with the facility's emergency generator components and downstream equipment, while maintaining seamless backup power for the buildings emergency power systems and relocate a new ASCO 7000, UL Type 3 (ATS), with bypass to the East side of the exterior of the facility.