CitySC
Jul 29, 2026
Closes
Aug 26, 2026
Municipal Complex Parking Lot Improvements
Provide municipal complex parking lot improvements.
Description: Work includes hard surface and exterior lighting improvements.
SchoolDistrict · MN, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
CitySC
Jul 29, 2026
Closes
Aug 26, 2026
Provide municipal complex parking lot improvements.
CityMI
Aug 3, 2026
Closes
Aug 21, 2026
Division A – Machine grading and asphalt paving of the existing gravel parking lot of Park. Division B – Excavation, grading, and construction of a new asphalt paved parking lot at Park.Division C – Site improvements to the Fire Station property including concrete, asphalt, and limited drainage and underground storm sewer work.
CityWA
Jul 22, 2026
Closes
Aug 12, 2026
Provide improved access to the pybus south parking lot necessary to accommodate electric vehicle chargers.
CityLA
Jul 27, 2026
Closes
Aug 20, 2026
Removal and replacement of 340 SY of 6"th. Pc concrete and 400 SY of 8"th. Pc concrete; installation of about 150 TN of limestone base; 280 LF of full depth sawcut; 260 LF of barrier curb ("tack-on" type); installation of concrete sidewalk with brick paver inlays (about 50 SY of pcc sidewalk and 155 SF of brick pavers); 2 EA type viii catch basins; 130 LF of 15" storm drain pipe; 2,400 LF of painted roadway markings; 4 EA light fixture pedestals; 400 LF of electrical conduit; miscellaneous sitework and erosion control; and related work
Procurement and program contacts connected to North Saint Paul Maplewood Oakdale School District 622.