Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes furnishing all material, equipment, labor, supervision and other requirements necessary to provide, install, and commission 3 replacement positive displacement digester blowers and motors, 3 turbo blowers and motors with VFDs to replace existing centrifugal aeration blowers, 2 dissolved oxygen probes with controller(s), LED lighting to replace high pressure sodium site lighting, and monitoring equipment at 6 lift stations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
WWTF implementation of flood controls including, structural, site, architectural and electrical improvements.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
WWTF implementation of flood controls including, structural, site, architectural and electrical improvements.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
West Cocalico Township Authority is soliciting bids via PennBid for the construction of a new approximately 2,500 SF garage pole building that includes an office and associated site work. The project is divided into three contracts: General Construction, Electrical Construction, and Mechanical Construction. Bids are due by 10:00 AM EST on February 2, 2026, and the project is subject to Pennsylvania Prevailing Wage and other statutory requirements.
Posted Date
Dec 29, 2025
Due Date
Feb 2, 2026
Release: Dec 29, 2025
Close: Feb 2, 2026
West Cocalico Township Authority is soliciting bids via PennBid for the construction of a new approximately 2,500 SF garage pole building that includes an office and associated site work. The project is divided into three contracts: General Construction, Electrical Construction, and Mechanical Construction. Bids are due by 10:00 AM EST on February 2, 2026, and the project is subject to Pennsylvania Prevailing Wage and other statutory requirements.
AvailableThe County of Fresno (General Services Department, Facility Services Division) is soliciting turnkey energy efficiency project proposals from pre-qualified Energy Services Companies (ESCOs) to deliver energy efficiency upgrades, renewable energy solutions, and infrastructure modernization at three county facilities (Clovis Campus Building Six; Plaza Building; Juvenile Justice Campus). Only ESCOs listed on the County Master Agreement Qualified List (Contract P-25-016) are eligible to submit proposals. The solicitation seeks comprehensive services including energy audits, savings analyses, design, construction, and potential financing of asset improvements; estimated project value range $5,000,000–$20,000,000.
Posted Date
Jan 15, 2026
Due Date
Feb 13, 2026
Release: Jan 15, 2026
Close: Feb 13, 2026
The County of Fresno (General Services Department, Facility Services Division) is soliciting turnkey energy efficiency project proposals from pre-qualified Energy Services Companies (ESCOs) to deliver energy efficiency upgrades, renewable energy solutions, and infrastructure modernization at three county facilities (Clovis Campus Building Six; Plaza Building; Juvenile Justice Campus). Only ESCOs listed on the County Master Agreement Qualified List (Contract P-25-016) are eligible to submit proposals. The solicitation seeks comprehensive services including energy audits, savings analyses, design, construction, and potential financing of asset improvements; estimated project value range $5,000,000–$20,000,000.
AvailableWork includes 250 CY mass rock excavation, complete, and disposal (minimum bid = $75 per cubic yard); 750 CY trench rock excavation, complete, and disposal (minimum bid = $75 per cubic yard); 270 LF drilled micropiles; 1 LS construction of the lab/admin building addition as shown in the plans; 1 LS schneider variable frequency drives (vfds) and motor control centers (mcc), complete as specified in section 16260 and 16920, respectively; 1 LS spare sections for mcc-d loads in the new motor control center (mcc-40) as shown in the electrical drawings 40 e-001a and 40 e-604a; 1 LS schneider spare sections for mcc-d loads in the new motor control center (mcc-40) as shown in the electrical drawings 40 e-001a and 40 e-604a. See outside link.
Posted Date
Dec 22, 2025
Due Date
Feb 17, 2026
Release: Dec 22, 2025
Close: Feb 17, 2026
Work includes 250 CY mass rock excavation, complete, and disposal (minimum bid = $75 per cubic yard); 750 CY trench rock excavation, complete, and disposal (minimum bid = $75 per cubic yard); 270 LF drilled micropiles; 1 LS construction of the lab/admin building addition as shown in the plans; 1 LS schneider variable frequency drives (vfds) and motor control centers (mcc), complete as specified in section 16260 and 16920, respectively; 1 LS spare sections for mcc-d loads in the new motor control center (mcc-40) as shown in the electrical drawings 40 e-001a and 40 e-604a; 1 LS schneider spare sections for mcc-d loads in the new motor control center (mcc-40) as shown in the electrical drawings 40 e-001a and 40 e-604a. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →