Closing soon

Geotechnical Drilling, Umpqua River Bridge

Description: Geotechnical drilling services for a proposed bridge pier protection project where US101 crosses over the Umpqua River near Reedsport, OR at approximately MP 211.1. As these fender structures are in the water to protect from boat collisions, the drilling will need to take place on a barge. A total of 8 geotechnical holes are required. TOTAL PROJECT COST

Buyer
Released
Oct 23, 2026
Closes
Nov 5, 2026(11 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts