Retrieving RFP details
Release
Close
City of Newark
The george wilson center improvements project includes, but is not limited to, site and facility accessibility improvements and the selective demolition, renovation, and new construction within the existing building. The scope includes removal and installation of new finishes and fixtures, enlargement of an existing room using non-structural partitions, and complete renovation of existing toilet rooms, including correction of floor slab elevations, installation of new plumbing fixtures, the addition of one all-gender restroom, and accessory upgrades. The correction of floor slab elevations at existing toilet rooms includes correcting existing and new slab elevations to achieve proper slope and drain connections. General building improvements including flooring replacement, interior finishes replacement, and exterior finishes replacement as shown on the attached drawings. Plumbing, electric, and hvac improvements are required for improvements and include, but not limited to, upgrades to existing lighting, replacement of plumbing fixtures, relocation of existing hot water heaters, exhaust fan, and grease trap and new piping, venting, and insulation as required to ensure complete operational systems.
ITB 25-01 George Wilson Center Improvements_uxkn7o1b2a
Three Rivers Community School District
Media center and chiller improvements.
City of Gilbert
Project consist of approx Gilbert Community Center Improvements Project.
City of Tacoma
To provide progressive design-build (pdb) services for tacoma power south service center improvements project. Work under this project includes design and construction of a new maintenance and storage building, new warehouse, new wash bay, new covered parking, new covered storage, site and traffic flow pattern improvements, and additional administrative and storage features. There are anticipated required site improvements needed as well, including site paving, Stormwater management, on-site septic and site security improvements.
Release
Oct 22, 2025
Close
Nov 18, 2025