Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of new diversion chamber, drop shaft, vent shaft, and interconnecting piping
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide fire protection modifications.
Posted Date
Oct 30, 2025
Due Date
Dec 17, 2025
Release: Oct 30, 2025
Close: Dec 17, 2025
Provide fire protection modifications.
AvailablePremium
Access the largest public sector contact database
The Project includes the reconfiguration of existing gate counters on Concourse A. The new gate counters will accommodate both Ease and proprietary airline equipment requiring electrical and telecommunication modifications. The project will also include hold room modifications at the west end of the concourse, a new tenant space between A11 and A12, relocation of the FIDS at the south end of the Concourse A Phase 1 connector, and infrastructure for experiential elements including a projector light wall.
Posted Date
Dec 1, 2025
Due Date
Jan 8, 2026
Release: Dec 1, 2025
Close: Jan 8, 2026
The Project includes the reconfiguration of existing gate counters on Concourse A. The new gate counters will accommodate both Ease and proprietary airline equipment requiring electrical and telecommunication modifications. The project will also include hold room modifications at the west end of the concourse, a new tenant space between A11 and A12, relocation of the FIDS at the south end of the Concourse A Phase 1 connector, and infrastructure for experiential elements including a projector light wall.
AvailableCSS Modifications No. 3. Including 390 LF of 8" PVC sewer pipe installation; 400 LF of 6" PVC sewer pipe installation; 18 ea PVC Wye for Sewer Lateral Installation; 18 ea PVC Cleanout Installation; 18 ea PVC Inline Trap Installation; 10 VF 4 Foot Diameter Sanitary Manhole; 1 ea Manhole Frame, Grade Rings, and Cover; 780 LF Sewer Main and Laterals; 20 SY Lawn and Open Space; 200 ton Paved Street Base Course 25mm; 500 SY Paved Street Wearing Course 12.5mm; 70 ton PennDOT Paved Street Binder Course 19mm; 50 LF Concrete Curb Replacement; 10 SY Brick Sidewalk Replacement. See attached file.
Posted Date
Oct 28, 2025
Due Date
Dec 17, 2025
Release: Oct 28, 2025
Close: Dec 17, 2025
CSS Modifications No. 3. Including 390 LF of 8" PVC sewer pipe installation; 400 LF of 6" PVC sewer pipe installation; 18 ea PVC Wye for Sewer Lateral Installation; 18 ea PVC Cleanout Installation; 18 ea PVC Inline Trap Installation; 10 VF 4 Foot Diameter Sanitary Manhole; 1 ea Manhole Frame, Grade Rings, and Cover; 780 LF Sewer Main and Laterals; 20 SY Lawn and Open Space; 200 ton Paved Street Base Course 25mm; 500 SY Paved Street Wearing Course 12.5mm; 70 ton PennDOT Paved Street Binder Course 19mm; 50 LF Concrete Curb Replacement; 10 SY Brick Sidewalk Replacement. See attached file.
AvailableThis project is to renovate the central rail maintenance facility to accommodate new railcars and better facilitate existing maintenance tasks. The work includes but is not limited to new steel mezzanines, new overhead cranes, catenary and other electrical modifications, modifications in high bay area fire suppression, ductwork, and hydroponic lines, and hydraulic maintenance room. See attached file.
Posted Date
Nov 17, 2025
Due Date
Dec 19, 2025
Release: Nov 17, 2025
Close: Dec 19, 2025
This project is to renovate the central rail maintenance facility to accommodate new railcars and better facilitate existing maintenance tasks. The work includes but is not limited to new steel mezzanines, new overhead cranes, catenary and other electrical modifications, modifications in high bay area fire suppression, ductwork, and hydroponic lines, and hydraulic maintenance room. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis