CountyOR
Posted
Oct 7, 2026
Nov 10, 2026
Description: The Region of Peel seeks a qualified vendor to pre-purchase the air pollution control device (APCD) for the GE Booth Water Resource Recovery Facility (WRRF). This is a goods procurement with a stated 12-month duration and online-only submissions. The bid document was not yet available on the posting, and the procurement is subject to CETA, CFTA, and other applicable trade agreements.
County · ON, CA
From the first pre-RFP signals to the published RFP and its files.
Meeting agenda
232 days before RFP
The Region's procurement activity report recorded an awarded contract, approved by delegated authority, for engineering services for the G.E. Booth WRRF TOX2 and ancillary-system refurbishment at $2,961,310 with Black & Veatch Canada Company.
AWARDED CONTRACTS BID COMPETITIVELY \> $100,000 - APPROVED BY DELEGATED AUTHORITY Awarded Contracts - T3 2025 Appendix II Procurement Activity Report -- T3 September 1 to December 31, 2025 11.2-9 9 Human Services Housing Services 2025-353P Operator of Peel Youth Village Housing and Acorn Community Programs Services and Housing in the Province (SHIP)…
Regional Municipality of Peel Council Agenda
Meeting agenda · Feb 26, 2026
Agenda packet
197 days before RFP
The revised agenda recorded that the Debt Issuance Committee passed a by-law authorizing borrowing of $19,650,000 for the G.E. Booth WRRF odour-control improvements project.
READ THREE TIMES AND PASSED BY THE DEBT ISSUANCE COMMITTEE this 2nd day of April, 2026 ____________________________ _________________________ Regional Clerk Regional Chair By-law Number 16-By-law Number 16-2026 2026 6.1-11 SCHEDULE "A" TO BY-LAW NUMBER 16-2026 (1) (2) (3) (4) (5) (6) (7) (8) Approved Principal Debentures Amount of Refinancing M.O.E. Amount…
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (19 days left)
Adjacent opportunities open for bidding right now.
CountyOR
Posted
Oct 7, 2026
Nov 10, 2026
Debt Issuance Committee of the Regional Municipality of Peel Revised Agenda
Agenda packet · Apr 2, 2026
Work consists of 1,400 SF Aeration Basin vertical, horizontal and overhead concrete surface removal and repair: Repair System B; 400 SF Aeration Basin vertical, horizontal and overhead concrete surface removal and repair: Repair System C; 176 LF Aeration Basin Polyurethane Injection Grouting.
CountyOH
Posted
Oct 5, 2026
Nov 6, 2026
Request for Qualifications for professional design and engineering services for a new Water Resource Recovery Facility.
CityNY
Posted
-
Nov 18, 2026
Work consists of 220 LF, UP-2a concrete rehabilitation in chlorine contact tanks and parshall flume, crack repair < 1/8" width; 220 LF, UP-2a concrete rehabilitation in chlorine contact tanks and parshall flume, crack repair > 1/8" width; 28 Sf, UP-2d concrete rehabilitation in chlorine contact tanks and parshall flume spall repair 1"- 3" depth; 107 LF, UP-2f concrete rehabilitation in chlorine contact tanks and parshall flume foam sealant; 1,250 SF, UP-3c water main connection temporary paving; 2,250 SF, UP-3d water main connection, final paving mill and overlay. See attached files.
CityOH
Posted
Oct 19, 2026
Dec 1, 2026
Water pollution control facility phase i CIP improvements. The project consists of centrifuge, digester and generator improvements. Anaerobic digester cleaning and rehabilitation includes replacement of floating covers and accessories, heater/heat exchangers and accessories, a sludge recirculation pump and associated piping. New missing system with mixing pumps and glass-lined piping will be added to Primary digesters No.1 and No.3. New Centrifuge No.2 including polymer feed system and sludge feed pump will be added for sludge dewatering. In addition, the project includes Electrical, Instrumentation, HVAC and Architectural/Structural work.
Decision makers connected to this RFP from Regional Municipality of Peel.