Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work for construction of a new gccs header pipe, condensate sumps, valves and other associated improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes, but is not limited to, survey and excavation of existing gas headers to determine invert elevation and dimensions, prefabricate HDPE condensate drains based on surveyed dimensions, install condensate drains on the landfill gas header, connect condensate drain to leachate manholes, and abandon two (2) existing condensate drains and remove one (1) existing condensate drain.
Posted Date
Aug 3, 2025
Due Date
Jan 27, 2026
Release: Aug 3, 2025
Close: Jan 27, 2026
Work includes, but is not limited to, survey and excavation of existing gas headers to determine invert elevation and dimensions, prefabricate HDPE condensate drains based on surveyed dimensions, install condensate drains on the landfill gas header, connect condensate drain to leachate manholes, and abandon two (2) existing condensate drains and remove one (1) existing condensate drain.
Premium
Access the largest public sector contact database
The scope includes constructing a new scale system.
Posted Date
Oct 20, 2025
Due Date
Dec 12, 2025
Release: Oct 20, 2025
Close: Dec 12, 2025
The scope includes constructing a new scale system.
Seeking bidders for non-routine gas collection and control systems (GCCS) repairs and maintenance.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
Seeking bidders for non-routine gas collection and control systems (GCCS) repairs and maintenance.
AvailableProvide WWTP air header replacement. Project consists of removing and replacing approx. 215 LF of existing 18" ductile iron pipe, fittings and appurtenances on an existing wastewater treatment plant air blower system, along with approx. 20 LF of 12" ductile iron pipe, fittings and two 12" butterfly valves. Contractor shall also restore concrete pavement disturbed by construction, expand existing concrete driveway, and recoat existing ductile iron pipe air header.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Provide WWTP air header replacement. Project consists of removing and replacing approx. 215 LF of existing 18" ductile iron pipe, fittings and appurtenances on an existing wastewater treatment plant air blower system, along with approx. 20 LF of 12" ductile iron pipe, fittings and two 12" butterfly valves. Contractor shall also restore concrete pavement disturbed by construction, expand existing concrete driveway, and recoat existing ductile iron pipe air header.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis