Summary
This pre-solicitation notice, issued by the U.S. Army Corps of Engineers (USACE) Omaha District, announces the Government's intent to issue a solicitation on or about July 27, 2026 for the Gavins Point Raw Water Intake Zebra Mussel Mitigation project at the Gavins Point Project in Crofton, Nebraska. The total small business set-aside contract requires the contractor to furnish all labor, equipment, and materials to design and install a zebra mussel abatement system to protect the powerhouse raw water intakes and intake piping, utilizing two small local tank skids with integral spill containment pallets, pump skids, and distribution equipment interfacing with existing raw water flow meters. Estimated construction cost is between $250,000 and $500,000 under NAICS code 237110, with work to be completed within 210 days after Notice to Proceed.