FederalNM
Posted
Aug 31, 2026
Oct 22, 2026
Hickman Wildlife Water Catchment and Pipe Fence (Request for Quotations)
Project includes tear down and removal of existing infrastructure (fence and catchment), hauling away all material except the t-post removed from the old fence which BLM will keep and haul and setting of two BOSS Tanks, building a 1,000 sq-ft metal catchment, construction of a support frame on outer side of tanks (if tanks cannot be buried), and a 1,000 linear foot/1.5-acre pipe and cable fence.
