Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Upgrade of the HVAC systems in zones 2-5 on the 1st floor of the GAO HQ. Breakouts- to be provided for labor hours, labor rates, materials, travel, markups, indirect rates, profit. Project includes: Cranes & Hoists, Flashing & Sheet Metal, HVAC Equipment, Instrumentation & Controls HVAC Insulation, Sound, Vibration & Seismic Control Testing, Adjusting & Balancing HVAC.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide 1st floor restroom renovation and break room renovations. Scope of work includes the partial demolition of restrooms and break room and a reconfiguration of floor plan at first floor. Two multi-stall restrooms will be reconfigured, brought to Americans with disabilities act (ADA) code, and upgraded with new finish materials and fixtures. Break room doors, casework, and flooring will be upgraded. Single fixture restrooms will be upgraded. A quiet room will be added. The heating, ventilation and air conditioning (HVAC) will be modified to serve the new floor plan. Electric and plumbing will be modified as required.
Posted Date
Jan 9, 2026
Due Date
Feb 24, 2026
Release: Jan 9, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide 1st floor restroom renovation and break room renovations. Scope of work includes the partial demolition of restrooms and break room and a reconfiguration of floor plan at first floor. Two multi-stall restrooms will be reconfigured, brought to Americans with disabilities act (ADA) code, and upgraded with new finish materials and fixtures. Break room doors, casework, and flooring will be upgraded. Single fixture restrooms will be upgraded. A quiet room will be added. The heating, ventilation and air conditioning (HVAC) will be modified to serve the new floor plan. Electric and plumbing will be modified as required.
AvailableRFP for HVAC Upgrades at The William Ashby Building.
Posted Date
-
Due Date
Mar 19, 2026
Close: Mar 19, 2026
RFP for HVAC Upgrades at The William Ashby Building.
AvailableHVAC upgrades.
Posted Date
Jan 14, 2026
Due Date
Jan 29, 2026
Release: Jan 14, 2026
Close: Jan 29, 2026
HVAC upgrades.
AvailableWendell School District #232 is requesting sealed proposals for the purchase and installation of HVAC rooftop units and outdoor makeup air units. This public works project is subject to Davis-Bacon prevailing wage requirements and requires 100% performance and payment bonds. Proposals are due by 3:00 PM on February 5, 2026, at 150 East Main Street, Wendell, Idaho, with specifications available from the district’s contact.
Posted Date
Jan 20, 2026
Due Date
Feb 5, 2026
Release: Jan 20, 2026
Close: Feb 5, 2026
Wendell School District #232 is requesting sealed proposals for the purchase and installation of HVAC rooftop units and outdoor makeup air units. This public works project is subject to Davis-Bacon prevailing wage requirements and requires 100% performance and payment bonds. Proposals are due by 3:00 PM on February 5, 2026, at 150 East Main Street, Wendell, Idaho, with specifications available from the district’s contact.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →