Summary
Work includes 600 EA water, sewer or water/sewer (including dedicated irrigation services and dismantlement's); 275 EA for split irrigation / conversion services only; 10 EA water quality sampling stations(wqss); 4 EA horizontal direction drill (add on to applicable 1b item above); 20 EA split irrigation service; 5 CY for the first 5 CY per project ; 20 CY for additional rock excavation after the initial 5 CY per project; 13,000 LF for cutting (sawing) asphalt pavement; for removing and disposing of asphalt pavement: 120 SY 0"-3" depth; 2,000 SY 3"-6" depth; 750 SY for each additional 3" depth of removal and disposal of asphalt pavement (will be in addition to item (b) above); 900 LF for cutting (sawing) concrete. See attached file.