Summary
Project consists of 100 cy of rock excavation, 6000 lf of for cutting (sawing) asphalt pavement, 8000 sy of per 1" depth (up to 12" depth), 15000 sy of per 1" depth surface course, 2000 sy of per 1" depth (greater than 12" depth), 3000 sy of milling per inch of asphalt, 200 lf of for cutting (sawing) asphalt pavement, 200 sy of per 1" depth (up to 12" depth), 500 lf of for cutting (sawing) concrete, 8" pvc sanitary sewer force main, replacing existing service connections and installing new service laterals, point repairs to existing sanitary sewer, horizontal directional drilling, punching or drilling lpss and 4" sewer laterals, concrete blocking. See attached file