FY27 SIDEWALK IMPROVEMENTS ZONE 3 (2026PW0044) - Groups 1 and 2 RFP
Construction of sidewalk and related pedestrian, curb, gutter, and driveway improvements for Groups 1 and 2 in Springfield, Missouri.
Description: Work includes 41 SY asphalt pavement removal; 57 SY concrete pavement removal; 15 SY sidewalk removal; 230 LF integral curb; 1,000 SF concrete sidewalk 4" new; 300 SY sod; 39,000 SF remove and replace 4" sidewalk; 4,250 SF remove and replace 6" curb ramp; 9,901 SF remove and replace 6" residential driveway; 4,650 sf remove and replace 8" commercial driveway or alley; 12,350 SF 6" raised sidewalk w/ monolithic curb edge; 500 SF thickened edge sidewalk; 3,165 LF remove and replace curb and gutter; 290 SF block retaining wall; 387 lf sidewalk brick removal; 200 SF structural concrete (6" reinforced). See attached file.
City · MO, US
Adjacent opportunities open for bidding right now.
CountyMO
Posted
Nov 17, 2026
Dec 16, 2026
Construction of sidewalk and related pedestrian, curb, gutter, and driveway improvements for Groups 1 and 2 in Springfield, Missouri.
CountyFL
Posted
-
Jan 16, 2027
The County seeks a contractor to furnish supervision, labor, materials, tools and equipment to construct and repair sidewalks, sidewalk connectors, driveway approaches, curb ramps, curbs and gutters at multiple sites, including removal/disposal of existing pavements, trees and debris, grading, sodding and adjustment of utility valve covers. The work is issued via Work Orders under a work-driven contract; one or more of the described tasks may be required at any given site and the County may add, delete or substitute comparable sites after award. The contract limits the combined total cost of all Work Orders to the Contract Award amount and requires compliance with the Engineer’s determinations for design or field-condition changes.
CountyFL
Posted
-
Dec 30, 2026
Construction work contract for furnishing supervision, labor, materials, tools and equipment to construct and/or repair sidewalks, sidewalk connectors, driveway approaches, curb ramps, curbs and gutters at multiple sites, including removal/disposal of existing pavements, trees and debris, grading, sodding and adjustment of utility valve covers. Work may include construction of new elements and reconstruction/repair of existing elements; specific tasks and locations will be assigned by individual Work Orders and the County does not guarantee assignment of the full contract amount. Bidders must meet specified licensing and experience requirements and comply with contract limits and Engineer-directed changes as described in the solicitation documents.
CountyFL
Posted
-
Jan 13, 2027
Construction services to furnish supervision, labor, materials, tools and equipment to construct and/or repair sidewalks, sidewalk connectors, driveway approaches, curb ramps, curbs and gutters at multiple sites. Work includes removal and disposal of existing pavements, trees and debris; grading and subgrade preparation; sodding; and adjustment of existing utility valve covers to finished grade, with sites and quantities identified by issued Work Orders. The contract is work-order driven across multiple locations and may require contractors to subcontract specialty trades and comply with design/field determinations by the Engineer.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
637 days before RFP
The 2024-2028 capital program lists a 2025 Sidewalk/Curb/Gutter/Ramp Program with a $6,225,000 budget and no reported expenditures or encumbrances through December 31, 2024.
CITY OF SPRINGFIELD 2024-2028 1/4-CENT CAPITAL IMPROVEMENT SALES TAX PROGRAM (FUND 41110) OCTOBER 1, 2024 TO SEPTEMBER 30, 2028 PROGRAMS ORIGINAL REVISED PREVIOUS OCTOBER TOTAL REMAINING PROJECT BUDGET PROJECT EXPENDITURES TO DECEMBER EXPENDITURES ENCUMBRANCES PROJECT PROGRAMS STATUS ESTIMATE ADJUSTMENTS BUDGET SEPT 30, 2024 EXPENDITURES DEC 31, 2024 DEC…
Citizens' Tax Oversight Committee Meeting Minutes
Board meeting · Feb 18, 2025
Sidewalk/Curb/Gutter/Ramp Program (Includes School Sidewalks) 2025 6,225,000.00 0.00 6,225,000.00 0.00 0.00 0.00 0.00 6,225,000.00
Citizens' Tax Oversight Committee Meeting Minutes
Board meeting · May 20, 2025
Sidewalk/Curb/Gutter/Ramp Program (Includes School Sidewalks) 2026 6,225,000.00 0.00 6,225,000.00 0.00 0.00 0.00 0.00 6,225,000.00
Citizens' Tax Oversight Committee Meeting Minutes
Agenda packet · Aug 26, 2025
CITY OF SPRINGFIELD 2024-2028 1/4-CENT CAPITAL IMPROVEMENT SALES TAX PROGRAM (FUND 41110) OCTOBER 1, 2024 TO SEPTEMBER 30, 2028 PROGRAMS ORIGINAL REVISED EXPENDITURES PREVIOUS TO DECEMBER OCTOBER EXPENDITURES ENCUMBRANCES PROJECT BUDGET PROJECT TOTAL REMAINING PROGRAMS STATUS ESTIMATE ADJUSTMENTS BUDGET SEPT 30, 2025 EXPENDITURES DEC 31, 2025 DEC 31, 2025…
Citizens' Tax Oversight Committee Meeting Minutes
Board meeting · Nov 18, 2025
Board meeting
455 days before RFP
The 2021–2025 transportation-sales-tax program records an in-process $600,000 ADA Sidewalk Transition Plan.
CITY OF SPRINGFIELD 2021-2025 1/8-CENT TRANSPORTATION SALES TAX PROGRAM (FUND 40060) APRIL 1, 2021 TO MARCH 31, 2025 PROGRAMS ORIGINAL REVISED PREVIOUS APRIL TOTAL REMAINING PROJECT BUDGET PROJECT EXPENDITURES TO JUNE EXPENDITURES ENCUMBRANCES PROJECT PROGRAMS STATUS BUDGET ADJUSTMENTS BUDGET MARCH 31, 2025 EXPENDITURES JUNE 30, 2025 JUNE 30, 2025 BUDGET…
Agenda packet
126 days before RFP
The proposed 2025–2029 Walkability Program would fund sidewalks, multimodal facilities, and trail and pedestrian connections, with $500,000 listed for 2027.
Project Number:25-00432025-2029 Walkability Program Project Description: Proposed Funding Sources: 1/8-cent Transportation Sales Tax 2,250,000$ Comments: Funding to support Forward SGF priorities related to sidewalks, multi-modal, trail connections, including at- and above-grade trail and pedestrian connections and facilities. This is a new project created…
City of Springfield Planning and Zoning Commission Meeting Agenda and Minutes
Agenda packet · Jul 14, 2026
Agenda packet
33 days before RFP
The proposed 2025–2029 Sidewalk/Curb/Gutter and Ramp Construction program would replace non-compliant or broken sidewalks and curb ramps and construct new ADA-compliant sidewalks, with $1,750,000 listed for 2027.
Walkability, Bicycle, and Safety Improvements Project Number:25-00342025-2029 Sidewalk/Curb/Gutter and Ramp Construction Project Description: Proposed Funding Sources: 1/4-cent Capital Improvement Sales Tax 6,225,000$ Comments: Replace non-compliant and/or broken sidewalks and curb ramps as needed and construct new sidewalks. Sidewalks and curb ramps will…
City of Springfield Planning and Zoning Commission Meeting Agenda and Minutes
Agenda packet · Oct 15, 2026
RFP published
Proposals due (24 days left)
Citizens' Tax Oversight Committee Meeting Minutes
Board meeting · Aug 19, 2025
** Sidewalk & Alternative Transportation Improvements In Process 0.00 600,000.00 600,000.00 316,341.83 57,034.41 373,376.24 5,872.84 220,750.92 ** ADA Sidewalk Transition Plan In Process 0.00 600,000.00 600,000.00 160,219.23 0.00 160,219.23 0.00 439,780.77
Citizens' Tax Oversight Committee Meeting Agenda
Agenda packet · May 20, 2025
Major Street Resurfacing & Rehabilitation 2025 5,000,000.00 0.00 5,000,000.00 0.00 0.00 0.00 0.00 5,000,000.00 Intelligent Transportation System (ITs) & Signal System Imp. 2025 675,000.00 0.00 675,000.00 0.00 0.00 0.00 0.00 675,000.00 Turn Lane & Safety Improvements 2025 1,000,000.00 0.00 1,000,000.00 0.00 0.00 0.00 0.00 1,000,000.00 Walkability 2025…
Citizens' Tax Oversight Committee Meeting Agenda
Agenda packet · May 20, 2025
Project Number:25-00342025-2029 Sidewalk/Curb/Gutter and Ramp Construction Project Description: Proposed Funding Sources: 1/4-cent Capital Improvement Sales Tax 6,225,000$ Comments: Replace non-compliant and/or broken sidewalks and curb ramps as needed and construct new sidewalks. Sidewalks and curb ramps will be constructed in compliance with the Americans…
City of Springfield City Council Meeting
Agenda packet · Oct 26, 2026
Decision makers connected to this RFP from City of Springfield.