CityMO
Posted
Nov 17, 2026
Dec 16, 2026
FY27 Sidewalk Improvements Zone 3 (2026PW0044) - Groups 1 and 2 RFP
Work includes 41 SY asphalt pavement removal; 57 SY concrete pavement removal; 15 SY sidewalk removal; 230 LF integral curb; 1,000 SF concrete sidewalk 4" new; 300 SY sod; 39,000 SF remove and replace 4" sidewalk; 4,250 SF remove and replace 6" curb ramp; 9,901 SF remove and replace 6" residential driveway; 4,650 sf remove and replace 8" commercial driveway or alley; 12,350 SF 6" raised sidewalk w/ monolithic curb edge; 500 SF thickened edge sidewalk; 3,165 LF remove and replace curb and gutter; 290 SF block retaining wall; 387 lf sidewalk brick removal; 200 SF structural concrete (6" reinforced). See attached file.