Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove and replace approximately 125+/- feet of trench drain, remove approximately 6" of concrete on each side of current trench drain, and remove approximately 2' feet +/- of sanitary piping in concrete.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Missouri Department of Transportation (MoDOT) is issuing an Invitation for Bid (IFB) for the FY26 NW Bethany Maintenance Building Trench Drain Replacement Project. The contractor will be responsible for removing and replacing approximately 125 +/- feet of trench drain. This work also includes removing concrete and sanitary piping embedded in concrete, with completion expected by January 28, 2026.
Posted Date
Jan 5, 2026
Due Date
Jan 28, 2026
Release: Jan 5, 2026
Close: Jan 28, 2026
The Missouri Department of Transportation (MoDOT) is issuing an Invitation for Bid (IFB) for the FY26 NW Bethany Maintenance Building Trench Drain Replacement Project. The contractor will be responsible for removing and replacing approximately 125 +/- feet of trench drain. This work also includes removing concrete and sanitary piping embedded in concrete, with completion expected by January 28, 2026.
AvailableProvide NW Library HVAC Replacement Project .
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
Provide NW Library HVAC Replacement Project .
AvailableThe Commonwealth of Virginia, through the Virginia Department of Transportation (VDOT), issued an Invitation for Bids (IFB) for the full HVAC replacement of an approximately 74,000 sq. ft. state office building, covering new mechanical rooms, mechanical shafts, rooftop equipment, partial demolition, and related structural and electrical work. The AI-estimated contract value is $5,000,000$10,000,000. The solicitation was posted 2025-12-31 with a response deadline of 2026-01-30 and is open as of 2026-01-01.
Posted Date
Dec 31, 2025
Due Date
Jan 30, 2026
Release: Dec 31, 2025
Close: Jan 30, 2026
The Commonwealth of Virginia, through the Virginia Department of Transportation (VDOT), issued an Invitation for Bids (IFB) for the full HVAC replacement of an approximately 74,000 sq. ft. state office building, covering new mechanical rooms, mechanical shafts, rooftop equipment, partial demolition, and related structural and electrical work. The AI-estimated contract value is $5,000,000$10,000,000. The solicitation was posted 2025-12-31 with a response deadline of 2026-01-30 and is open as of 2026-01-01.
AvailableRemoval and replacement of the existing failing storm drain system as identified in the attached plans. The work to be performed under this contract includes, but is not limited to, the following items: Removal and replacement of the existing 48-inch HDPE storm drainage system, including associated storm structures, as identified in the construction plans. Installation of new storm drainage structures, Installation of 48-inch HP Storm Grey Polypropylene Solid Dual Wall Pipe storm pipe, complete with all required appurtenances, Traffic control and maintenance of traffic in accordance with approved traffic control plans, Dewatering operations as required to facilitate construction, Backfilling, compaction, grading, and restoration of disturbed areas, Borrow material placement and grading, as necessary, Storm drainage and structure installation, Erosion and sedimentation control measures, Grassing and final site stabilization and final grading providing surface drainage to new drop inlets.
Posted Date
Jan 7, 2026
Due Date
Feb 11, 2026
Release: Jan 7, 2026
Close: Feb 11, 2026
Removal and replacement of the existing failing storm drain system as identified in the attached plans. The work to be performed under this contract includes, but is not limited to, the following items: Removal and replacement of the existing 48-inch HDPE storm drainage system, including associated storm structures, as identified in the construction plans. Installation of new storm drainage structures, Installation of 48-inch HP Storm Grey Polypropylene Solid Dual Wall Pipe storm pipe, complete with all required appurtenances, Traffic control and maintenance of traffic in accordance with approved traffic control plans, Dewatering operations as required to facilitate construction, Backfilling, compaction, grading, and restoration of disturbed areas, Borrow material placement and grading, as necessary, Storm drainage and structure installation, Erosion and sedimentation control measures, Grassing and final site stabilization and final grading providing surface drainage to new drop inlets.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →