Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists of placing 65,000 cubic yards (in-place) of unclassified material from the little river inlet to re-establish the upcoast sand dike and berm at the jetty key-in.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes maintenance dredging of the Federal Navigation Channel and deposition basin in Fire Island Inlet with placement of the dredged material. All questions are in regard to the Maintenance Dredging of Fire Island Inlet And Shores Westerly To Jones Inlet, New York Beach Erosion Control And Navigation Project.
Posted Date
Jan 29, 2026
Due Date
Feb 13, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes maintenance dredging of the Federal Navigation Channel and deposition basin in Fire Island Inlet with placement of the dredged material. All questions are in regard to the Maintenance Dredging of Fire Island Inlet And Shores Westerly To Jones Inlet, New York Beach Erosion Control And Navigation Project.
AvailableHarbor maintenance dredging. Remove approx. 180,000 CY of accumulated sediment across the three project features.
Posted Date
Oct 17, 2025
Due Date
Nov 5, 2028
Release: Oct 17, 2025
Close: Nov 5, 2028
Harbor maintenance dredging. Remove approx. 180,000 CY of accumulated sediment across the three project features.
AvailableBase work shall include dredging of the canal from Station 00+000 to Station 250+440. From Station 99+000 to Station 250+440 dredging will be required to a depth of 35’ MLLW (Datum) plus 1’ allowable over dredge and to a distance of 25 feet outside the channel limits where shoaling occurs along the channel edge within the authorized channel limits. Dredging will be required to a depth of 36’ MLLW (Datum) plus 1’ allowable overdepth within the contract work limits shown on the drawings from station 00+000 to station 250+440, with no side slopes delineated and/or paid for.
Posted Date
Jan 22, 2026
Due Date
Feb 6, 2026
Release: Jan 22, 2026
Close: Feb 6, 2026
Base work shall include dredging of the canal from Station 00+000 to Station 250+440. From Station 99+000 to Station 250+440 dredging will be required to a depth of 35’ MLLW (Datum) plus 1’ allowable over dredge and to a distance of 25 feet outside the channel limits where shoaling occurs along the channel edge within the authorized channel limits. Dredging will be required to a depth of 36’ MLLW (Datum) plus 1’ allowable overdepth within the contract work limits shown on the drawings from station 00+000 to station 250+440, with no side slopes delineated and/or paid for.
AvailableFY26 GIWW Maintenance Dredging. Pipeline maintenance dredging and advanced maintenance dredging of the Bay. Schedule 1 will include GIWW maintenance dredging of approx. 1.5 million cubic yards (CY) of the Bay and will include varying advanced maintenance depths. Material will be placed across various placement areas located along the GIWW. This contract will be subject to several environmental windows, including bird nesting, turtle nesting, and piping plover.
Posted Date
Nov 10, 2025
Due Date
Aug 4, 2026
Release: Nov 10, 2025
Close: Aug 4, 2026
FY26 GIWW Maintenance Dredging. Pipeline maintenance dredging and advanced maintenance dredging of the Bay. Schedule 1 will include GIWW maintenance dredging of approx. 1.5 million cubic yards (CY) of the Bay and will include varying advanced maintenance depths. Material will be placed across various placement areas located along the GIWW. This contract will be subject to several environmental windows, including bird nesting, turtle nesting, and piping plover.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →