Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists of the following construction within a shallow channel: Schedule 1 - will consist of a 3-foot raise, inlet structure installation and H&H shoreline protection feature for PA 13; Option 1 - will consist of a clearing/grubbing and minor dike repairs/grade for PA 10. Option 2 – will consist of inlet structure repairs for PA 10; Option 3 – will consist of a splash pad for PA 10.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The U.S. Army Corps of Engineers, Galveston District issued a Sources Sought (W912HY-26-S-1AX4) to gauge industry interest and capabilities for construction work at Harlingen Placement Area PA-13 and PA-10. Work includes a 3-foot raise, inlet structure installation and shoreline protection for PA-13, with optional clearing/grubbing, minor dike repairs, inlet repairs, and a splash pad for PA-10; period of performance is up to 190 calendar days (with 120-day option items). The estimated construction cost range is $1,000,000 to $5,000,000 and firms should submit capability information (UEI, CAGE, project experience, bonding capacity) by the response deadline.
Posted Date
Dec 3, 2025
Due Date
Dec 17, 2026
Release: Dec 3, 2025
Premium
Access the largest public sector contact database
The U.S. Army Corps of Engineers, Galveston District issued a Sources Sought (W912HY-26-S-1AX4) to gauge industry interest and capabilities for construction work at Harlingen Placement Area PA-13 and PA-10. Work includes a 3-foot raise, inlet structure installation and shoreline protection for PA-13, with optional clearing/grubbing, minor dike repairs, inlet repairs, and a splash pad for PA-10; period of performance is up to 190 calendar days (with 120-day option items). The estimated construction cost range is $1,000,000 to $5,000,000 and firms should submit capability information (UEI, CAGE, project experience, bonding capacity) by the response deadline.
AvailablePerform fy26 AIWW dredge material placement facility (DMPF) improvements. Work includes the repair and improvement of four atlantic intracoastal waterway (AIWW upland placement. Upland placement areas will also require the complete replacement of spillway systems which consists of a platform structure, stoplogs, and pipe system to drain water from future dredged material to be placed at the site.
Posted Date
Dec 3, 2025
Due Date
Jan 6, 2026
Release: Dec 3, 2025
Close: Jan 6, 2026
Perform fy26 AIWW dredge material placement facility (DMPF) improvements. Work includes the repair and improvement of four atlantic intracoastal waterway (AIWW upland placement. Upland placement areas will also require the complete replacement of spillway systems which consists of a platform structure, stoplogs, and pipe system to drain water from future dredged material to be placed at the site.
AvailableImprovement work on the Freeport Harbor PA 1 has typically been performed under a single contract since the inception of the PA. The Freeport PA 1 is a contiguous, discrete site that is used to store dredged material for the Federal Navigation Channel (Freeport Harbor Channel). PA 1 is approx.324 acres, enclosed by a single continuous dike, and is only accessible by land from one entrance location, located in the southwest corner. Work to be completed in this contract includes raising the containment dike an additional three feet, training dike construction, lateral ditching, and repair of an existing outlet structure.
Posted Date
Nov 26, 2025
Due Date
Jan 6, 2026
Release: Nov 26, 2025
Close: Jan 6, 2026
Improvement work on the Freeport Harbor PA 1 has typically been performed under a single contract since the inception of the PA. The Freeport PA 1 is a contiguous, discrete site that is used to store dredged material for the Federal Navigation Channel (Freeport Harbor Channel). PA 1 is approx.324 acres, enclosed by a single continuous dike, and is only accessible by land from one entrance location, located in the southwest corner. Work to be completed in this contract includes raising the containment dike an additional three feet, training dike construction, lateral ditching, and repair of an existing outlet structure.
AvailableThe City of Douglas, GA is soliciting sealed bids for comprehensive renovations and improvements to multiple WWII Airport buildings (administration, museum, barracks, hospital, and hangars). Bids are due January 20, 2026 at 2:30 PM local time and work must be completed within 150 days of award.
Posted Date
-
Due Date
Jan 20, 2026
Release: -
Close: Jan 20, 2026
The City of Douglas, GA is soliciting sealed bids for comprehensive renovations and improvements to multiple WWII Airport buildings (administration, museum, barracks, hospital, and hangars). Bids are due January 20, 2026 at 2:30 PM local time and work must be completed within 150 days of award.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis