Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sidewalk shaving to eliminate vertical displacements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Vallejo is soliciting bids for the Citywide Concrete Grinding and Shaving project to repair offsets and damaged public sidewalks. The scope of work includes inspection, documentation, grinding, and reporting data compatible with the City’s GIS system. Contractors are responsible for providing all labor, materials, equipment, and traffic control in accordance with CA MUTCD standards.
Posted Date
Jan 23, 2026
Due Date
Feb 19, 2026
Release: Jan 23, 2026
Close: Feb 19, 2026
The City of Vallejo is soliciting bids for the Citywide Concrete Grinding and Shaving project to repair offsets and damaged public sidewalks. The scope of work includes inspection, documentation, grinding, and reporting data compatible with the City’s GIS system. Contractors are responsible for providing all labor, materials, equipment, and traffic control in accordance with CA MUTCD standards.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
2026 curb and sidewalk program project.
Posted Date
Jan 20, 2026
Due Date
Feb 11, 2026
Release: Jan 20, 2026
Close: Feb 11, 2026
2026 curb and sidewalk program project.
AvailablePerform sidewalk repair.
Posted Date
Jan 15, 2026
Due Date
Feb 18, 2026
Release: Jan 15, 2026
Close: Feb 18, 2026
Perform sidewalk repair.
AvailableProject consists of the removal and replacement of 4,660 total lineal feet (LF) of sidewalk and the installation of 740 LF of new sidewalk within the village of rawson. The sidewalk shall be 4 feet in width and constructed to a thickness of 4 inches (4").
Posted Date
Jan 20, 2026
Due Date
Feb 3, 2026
Release: Jan 20, 2026
Close: Feb 3, 2026
Project consists of the removal and replacement of 4,660 total lineal feet (LF) of sidewalk and the installation of 740 LF of new sidewalk within the village of rawson. The sidewalk shall be 4 feet in width and constructed to a thickness of 4 inches (4").
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →