Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform fy26 AIWW dredge material placement facility (DMPF) improvements. Work includes the repair and improvement of four atlantic intracoastal waterway (AIWW upland placement. Upland placement areas will also require the complete replacement of spillway systems which consists of a platform structure, stoplogs, and pipe system to drain water from future dredged material to be placed at the site.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
approx. 250,000 CY of dredge material.
Posted Date
Dec 8, 2025
Due Date
Jan 2, 2026
Release: Dec 8, 2025
Close: Jan 2, 2026
approx. 250,000 CY of dredge material.
AvailablePremium
Access the largest public sector contact database
The US Army Corps of Engineers (USACE) Buffalo District issued Presolicitation W912P426BA001 for the FY26 Cleveland Dredge project to remove approximately 250,000 cubic yards of dredge material from Cleveland Harbor on Lake Erie, supporting navigable waterways. The contract is planned as a Firm-Fixed-Price under an Invitation for Bid (IFB), estimated between $10,000,000 and $25,000,000, and was issued as a Small Business set-aside (NAICS 23799). The solicitation lists a posting date of 2025-12-08 and a response deadline of 2026-01-02, and the HigherGov entry links to the official SAM.gov posting for full details and response instructions.
Posted Date
Dec 8, 2025
Due Date
Jan 2, 2026
Release: Dec 8, 2025
Close: Jan 2, 2026
The US Army Corps of Engineers (USACE) Buffalo District issued Presolicitation W912P426BA001 for the FY26 Cleveland Dredge project to remove approximately 250,000 cubic yards of dredge material from Cleveland Harbor on Lake Erie, supporting navigable waterways. The contract is planned as a Firm-Fixed-Price under an Invitation for Bid (IFB), estimated between $10,000,000 and $25,000,000, and was issued as a Small Business set-aside (NAICS 23799). The solicitation lists a posting date of 2025-12-08 and a response deadline of 2026-01-02, and the HigherGov entry links to the official SAM.gov posting for full details and response instructions.
AvailableThe U.S. Army Corps of Engineers, Galveston District issued a Sources Sought (W912HY-26-S-1AX4) to gauge industry interest and capabilities for construction work at Harlingen Placement Area PA-13 and PA-10. Work includes a 3-foot raise, inlet structure installation and shoreline protection for PA-13, with optional clearing/grubbing, minor dike repairs, inlet repairs, and a splash pad for PA-10; period of performance is up to 190 calendar days (with 120-day option items). The estimated construction cost range is $1,000,000 to $5,000,000 and firms should submit capability information (UEI, CAGE, project experience, bonding capacity) by the response deadline.
Posted Date
Dec 3, 2025
Due Date
Dec 17, 2026
Release: Dec 3, 2025
Close: Dec 17, 2026
The U.S. Army Corps of Engineers, Galveston District issued a Sources Sought (W912HY-26-S-1AX4) to gauge industry interest and capabilities for construction work at Harlingen Placement Area PA-13 and PA-10. Work includes a 3-foot raise, inlet structure installation and shoreline protection for PA-13, with optional clearing/grubbing, minor dike repairs, inlet repairs, and a splash pad for PA-10; period of performance is up to 190 calendar days (with 120-day option items). The estimated construction cost range is $1,000,000 to $5,000,000 and firms should submit capability information (UEI, CAGE, project experience, bonding capacity) by the response deadline.
AvailableThe work consists of the following construction within a shallow channel: Schedule 1 - will consist of a 3-foot raise, inlet structure installation and H&H shoreline protection feature for PA 13; Option 1 - will consist of a clearing/grubbing and minor dike repairs/grade for PA 10. Option 2 – will consist of inlet structure repairs for PA 10; Option 3 – will consist of a splash pad for PA 10.
Posted Date
Dec 3, 2025
Due Date
Dec 17, 2026
Release: Dec 3, 2025
Close: Dec 17, 2026
The work consists of the following construction within a shallow channel: Schedule 1 - will consist of a 3-foot raise, inlet structure installation and H&H shoreline protection feature for PA 13; Option 1 - will consist of a clearing/grubbing and minor dike repairs/grade for PA 10. Option 2 – will consist of inlet structure repairs for PA 10; Option 3 – will consist of a splash pad for PA 10.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis