Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The FY2026G Storm Water Repair and Improvement project is an invitation to bid for enhancing storm water infrastructure within the city limits of Charlotte, NC. The scope of work includes mobilization, earthwork, installation of drainage structures, storm drain pipe systems, channels, and asphalt paving. The project has an estimated value of approximately $5.4 million and is managed by Charlotte Water.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consist of 350 CY of borrow excavation, 100 CY of ditch excavation, 5 EA of structure removal, 12 CY of structure removal5 CY of wall removal, 5 EA of excavation for pipe collars (excavation greater than 5' but less than 10'), 100 LF of excavation for pipe installation (excavation greater than 5' but less than 10'), 125 SY of foundation conditioning geotextile, 100 LF of 15" RC Pipe culverts, class III, 100 LF of 18" RC pipe culverts, class III, 200 tn of asphalt plant mix, pavement repair. See attached file.
Posted Date
Jan 20, 2026
Due Date
Feb 11, 2026
Release: Jan 20, 2026
Close: Feb 11, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of 350 CY of borrow excavation, 100 CY of ditch excavation, 5 EA of structure removal, 12 CY of structure removal5 CY of wall removal, 5 EA of excavation for pipe collars (excavation greater than 5' but less than 10'), 100 LF of excavation for pipe installation (excavation greater than 5' but less than 10'), 125 SY of foundation conditioning geotextile, 100 LF of 15" RC Pipe culverts, class III, 100 LF of 18" RC pipe culverts, class III, 200 tn of asphalt plant mix, pavement repair. See attached file.
Improve wastewater and storm water enhancement treatment applications.
Posted Date
Oct 13, 2025
Due Date
Feb 10, 2026
Release: Oct 13, 2025
Close: Feb 10, 2026
Improve wastewater and storm water enhancement treatment applications.
AvailableThe City of Charlotte (Department: Charlotte Water) is soliciting bids for construction of the Shamrock Gardens Storm Drainage Improvement Project near Eastway Drive and Shamrock Drive. The work addresses a deteriorated corrugated metal pipe system and mitigates flooding at multiple roadway crossings within the project area bounded by Purser Drive, Shamrock Drive, Briar Creek, and Eastway Drive. The estimated construction cost is $7,154,105, with a pre-bid meeting on February 10, 2026, and bids due February 24, 2026.
Posted Date
Jan 29, 2026
Due Date
Feb 24, 2026
Release: Jan 29, 2026
Close: Feb 24, 2026
The City of Charlotte (Department: Charlotte Water) is soliciting bids for construction of the Shamrock Gardens Storm Drainage Improvement Project near Eastway Drive and Shamrock Drive. The work addresses a deteriorated corrugated metal pipe system and mitigates flooding at multiple roadway crossings within the project area bounded by Purser Drive, Shamrock Drive, Briar Creek, and Eastway Drive. The estimated construction cost is $7,154,105, with a pre-bid meeting on February 10, 2026, and bids due February 24, 2026.
AvailableProvide Rocky Gorge Path Storm Repair.
Posted Date
Jul 25, 2025
Due Date
Aug 1, 2026
Release: Jul 25, 2025
Close: Aug 1, 2026
Provide Rocky Gorge Path Storm Repair.