Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide Rocky Gorge Path Storm Repair.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Annual sanitary and storm system repair program.
Posted Date
Jan 8, 2026
Due Date
Jan 23, 2026
Release: Jan 8, 2026
Close: Jan 23, 2026
Annual sanitary and storm system repair program.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of emergency repair work on the existing gorge and stream bed including but not limited to clearing, earthwork, installation of geobag reinforcement walls, rip rap apron, concrete curb, full depth pavement repair, fence, landscaping, and restoration.
Posted Date
Jan 9, 2026
Due Date
Feb 3, 2026
Release: Jan 9, 2026
Close: Feb 3, 2026
Project consists of emergency repair work on the existing gorge and stream bed including but not limited to clearing, earthwork, installation of geobag reinforcement walls, rip rap apron, concrete curb, full depth pavement repair, fence, landscaping, and restoration.
AvailableCrestmoor Canyon Storm Repair includes removing existing manhole, installing drilling piers, concrete base slab, tie concrete base slab to existing soldier pipes, new precast concrete manhole.
Posted Date
-
Due Date
Jan 20, 2026
Release: -
Close: Jan 20, 2026
Crestmoor Canyon Storm Repair includes removing existing manhole, installing drilling piers, concrete base slab, tie concrete base slab to existing soldier pipes, new precast concrete manhole.
AvailableThis project involves sanitary and storm sewer point repairs including but not limited to: sanitary and storm sewer excavation point repairs; replacement of wye and lateral pipe; mh installation; location and adjustment of buried sanitary and storm sewer manholes; invert replacement; cctv verification of the repair locations; and the post repair nassco CCTV.
Posted Date
Jan 15, 2026
Due Date
Feb 4, 2026
Release: Jan 15, 2026
Close: Feb 4, 2026
This project involves sanitary and storm sewer point repairs including but not limited to: sanitary and storm sewer excavation point repairs; replacement of wye and lateral pipe; mh installation; location and adjustment of buried sanitary and storm sewer manholes; invert replacement; cctv verification of the repair locations; and the post repair nassco CCTV.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →