Summary
Work includes 1 LS construction area signs; 440 LF temporary check dam; 1,080 LF temporary silt fence; 1,000 LF temporary wildlife exclusion fence; 18 SY remove concrete (lined ditch); 1,000 LF temporary high visibility fence; 2,150 CY roadway excavation; 2,060 CY imported borrow; 28,900 SF hydroseed; 2,050 CY class 2 aggregate base; 840 ton hot mix asphalt (type a); 400 LF place hot mix asphalt dike (type d); 65 SY cold plane asphalt concrete pavement; 40 LF 15" reinforced concrete pipe; 460 LF 24" reinforced concrete pipe; 4 EA 15" concrete flared end section; 4 EA 24" concrete flared end section. See attached file.