Summary
Work consist of 31 EA of pot hole utilities, 1750 CY of trench import backfill material, 7 EA of fire hydrant assembly, 2400 LF of 8" pvc c900 DR 14 water main, 20 LF of 6" PVC c900 DR 14 water main, temporary water service, 3 EA of water main fittings 8" tee, 7 EA of water main fittings 8" x 6" swivel tee, 3 ea of water main fittings 8"x 6" reducer, 14 EA of water main fittings 8" bends, 3 EA of cap abandoned water main, 10 EA of gate valve 8", 52 EA of water service reconnect 3/4" diameter, 20 EA of lead service replacement connection, 660 LF of lead service replacement line, 700 LF of remove and replace concrete curb & gutter 30", 2160 SF of remove and replace concrete sidewalk. See attached file.