CityCA
Posted
Jun 23, 2026
Sep 24, 2026
FY 2026-27 Annual Major Streets Rehabilitation Program: Los Angeles Avenue (First Street to Erringer Road) *Re-Bid*
Work includes bud is not limited to, 153,977 SF coldmilling - 2-1/2" full width; 620 SF pcc sidewalk replacement per sspwc 112-2 and 133-2; 6 LF pcc curb and gutter replacement per sppwc standard plan no. 120-3, type a2- 6, w=18"; 6 EA curb ramp reconstruction per most recent caltrans standard plan a88a and a88b, case per plan; 72 LF pcc sidewalk grinding at lifted joint; 2,500 TON asphalt rubberized hot mix (arhm c-gg pg 64-16); 5 EA sewer manhole frame, ring and cover removal and replacement; 7 EA water valve box, cover, and riser removal and replacement. See attached file.