Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Curb ramp replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project work consists of ADA curb ramp improvements at various locations.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Project work consists of ADA curb ramp improvements at various locations.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
2025 miscellaneous concrete curb, sidewalk and accessible ramp improvements for public works roads.
Posted Date
Jan 5, 2026
Due Date
Jan 28, 2026
Release: Jan 5, 2026
Close: Jan 28, 2026
2025 miscellaneous concrete curb, sidewalk and accessible ramp improvements for public works roads.
AvailableConstruct nine new ADA ramps, form and pour 847 SY new concrete walks, and construct one 154 SF median crossing island includes 11 CY general excavation, 500 SF crushed stone path, 137 LF concrete curb type A, 873 SF monolithic curb and sidewalks, 9 SF extra for new curb ramps, 400 EA longitudinal pavement markings - paint, 39 SF signs, standard sheeting, extruded aluminum.
Posted Date
Jan 12, 2026
Due Date
Feb 11, 2026
Release: Jan 12, 2026
Close: Feb 11, 2026
Construct nine new ADA ramps, form and pour 847 SY new concrete walks, and construct one 154 SF median crossing island includes 11 CY general excavation, 500 SF crushed stone path, 137 LF concrete curb type A, 873 SF monolithic curb and sidewalks, 9 SF extra for new curb ramps, 400 EA longitudinal pavement markings - paint, 39 SF signs, standard sheeting, extruded aluminum.
AvailableInstall approx. 7,200 LF of 8", 6", and 2" PVC/DI pipe water main including, fire hydrants, valves, driveway replacement, earthwork, grassing, soil erosion and sedimentation control measures, and appurtenances necessary to provide a complete installation.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
Install approx. 7,200 LF of 8", 6", and 2" PVC/DI pipe water main including, fire hydrants, valves, driveway replacement, earthwork, grassing, soil erosion and sedimentation control measures, and appurtenances necessary to provide a complete installation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →