Closing soon

FS CRP FY26 Mulford Hall Exterior Maintenance (Advertisement for Bids)

Description: Work includes: there are two phases of this project. Phase 1 will be the n, w, s elevations and phase 2 will be the east elevation. 1. Perform a detailed sounding survey of the exterior concrete walls to verify the current condition of the concrete and confirm the extent of unsound, delaminated, or distressed material. 2. Perform concrete repairs at all locations identified as unsound, delaminated or distressed in the contractor's verification survey. 3. Conduct all repairs per specifications and match the existing wall texturing.

Buyer
University Of California Berkeley

HigherEducation · CA, US

Released
Aug 17, 2026
Closes
Sep 10, 2026(8 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts