CityOK
Jul 24, 2026
Closes
Aug 10, 2026
Landfill Cell 2A Project RFP
Landfill Cell 2A Project.
Description: The work includes earth excavation; handling, hauling and placing of the excavated material in embankments, trimming of the canal prism; and furnishing and placing unreinforced concrete canal lining. The work includes the construction of 3 reinforced concrete inverted siphon crossings of 3 roadways, 6 reinforced concrete turnout structures on the new canal, modifications to 1 existing turnout structure, canal tie-ins, removal and abandonment work, and miscellaneous utility relocation and modification work.
SpecialDistrict · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityOK
Jul 24, 2026
Closes
Aug 10, 2026
Landfill Cell 2A Project.
Southeast Louisiana Flood Protection Authority - East
Special DistrictLA
Jul 13, 2026
Closes
Aug 11, 2026
Construction of erosion mitigation within the London Avenue Canal from Gentilly Boulevard to Mirabeau Avenue, as well as any related and incidental materials and work.
Special DistrictTX
Jul 31, 2026
Closes
Aug 27, 2026
Work necessary for excavation and lot/ROW improvements of approx. 57,000 CY over approximately 31 acres.
-
Closes
Aug 12, 2026
Project consists of selective demolition, readymix concrete, spalled concrete repair, cast in place concrete, unit masonry, structural steel and metal fabrications, wood framing, drywall, ceilings and soffits, roofing, air barrier, aluminum entrances, doors, frames and hardware, framing and drywall, painting/plaster, flooring, tiling and base trim, wall finishes, signage, casework, window treatments, landscaping, pavers and hardscapes, kitchen equipment, fire suppression
Procurement and program contacts connected to Friant Water Authority.