Posted
Jun 3, 2026
Jun 18, 2028
Freshwater Bayou - Lock to The Gulf, Freshwater Bayou Maintenance Dredging #26-2, ED 26-025
The work consists of the removal and satisfactory disposal of all material above elevation -16.0 MLG from C/L Station 70+00 (Mile 1.3) to C/L Station -210+00 (Mile -4.0), of Freshwater Bayou Channel
