Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes to comprehensively replace the DOAS and related HVAC equipment for buildings 1 and 2 on the campus.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes to replace the chiller, piping and accessories exterior of the building.
Posted Date
Jan 14, 2026
Due Date
Feb 19, 2026
Release: Jan 14, 2026
Close: Feb 19, 2026
Work includes to replace the chiller, piping and accessories exterior of the building.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
IFB: Traffic Signal Maintenance (MDOT Prequalification) - On Call - 1 Year with 2 1-year options.
Posted Date
Jan 14, 2026
Due Date
Jan 30, 2026
Release: Jan 14, 2026
Close: Jan 30, 2026
IFB: Traffic Signal Maintenance (MDOT Prequalification) - On Call - 1 Year with 2 1-year options.
AvailableWork consists of replace HVAC systems, include replace existing steam boiler with new hot water boiler. Replace existing pneumatic controls with new ddc controls; replace (2) two make-up air units and (8) eight exhaust fans; replace (3) wall hung boilers / associated hydronic specialties and (5) split system condensing units / fan coil units; replace (3) wall hung boilers / associated hydronic specialties, air cooled chiller system and (2) indoor multi-zone units. Includes conversion of multi-zone equipment to vav with an estimated (16) vav terminal unit zones. Replace steam boiler system, air cooled chiller system and one outdoor air handling unit. Retrofit controls on the following existing equipment; (5) steam coils, (1) heat exchanger and crawlspace fan coil unit.
Posted Date
Jan 9, 2026
Due Date
Feb 17, 2026
Release: Jan 9, 2026
Close: Feb 17, 2026
Work consists of replace HVAC systems, include replace existing steam boiler with new hot water boiler. Replace existing pneumatic controls with new ddc controls; replace (2) two make-up air units and (8) eight exhaust fans; replace (3) wall hung boilers / associated hydronic specialties and (5) split system condensing units / fan coil units; replace (3) wall hung boilers / associated hydronic specialties, air cooled chiller system and (2) indoor multi-zone units. Includes conversion of multi-zone equipment to vav with an estimated (16) vav terminal unit zones. Replace steam boiler system, air cooled chiller system and one outdoor air handling unit. Retrofit controls on the following existing equipment; (5) steam coils, (1) heat exchanger and crawlspace fan coil unit.
AvailableThe City of Corona is soliciting prequalification submissions (RFQual RFQ 26-027CA) for the Fire Station No. 2 - Phase 1 Project, which includes construction of a 7,800 sq ft apparatus/storage building, a 900 sq ft gym, site improvements, underground utilities, an emergency generator, and related work. Only Class B General Building Contractors may apply and must complete the prequalification questionnaire and submit required documentation electronically through the PlanetBids Documents & Attachments tab. The prequalification package is due Feb 5, 2026 at 3:00 PM PST and the construction period is anticipated to begin July 2026 with completion by June 2027.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
The City of Corona is soliciting prequalification submissions (RFQual RFQ 26-027CA) for the Fire Station No. 2 - Phase 1 Project, which includes construction of a 7,800 sq ft apparatus/storage building, a 900 sq ft gym, site improvements, underground utilities, an emergency generator, and related work. Only Class B General Building Contractors may apply and must complete the prequalification questionnaire and submit required documentation electronically through the PlanetBids Documents & Attachments tab. The prequalification package is due Feb 5, 2026 at 3:00 PM PST and the construction period is anticipated to begin July 2026 with completion by June 2027.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →