Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construction manager at risk one step process for kitchen addition and renovation with all new equipment, replace domestic water heater, replace valves on sprinkler system, new hvac controls, add / replace two new chillers and five new rtus, add / replace digital marquee, paint auxiliary gym walls, renovate toilet rooms, add entry resistant film at all first floor glazing, upgrade consumer science lab
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Elementary School - renovation & kitchen addition.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
Elementary School - renovation & kitchen addition.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of a security addition and renovation work for Harrah Middle School. The work consists of approx. 640 SF of new build to encapsulate a larger area for the media center. The remainder of the 9,300 SF of work is for complete renovation of the administration, restrooms, and a science classroom. The project also consists of the addition of a large structural steel canopy wrapping a portion of the building providing dry traversing space from the drop off area into the building. Existing MEP upgrades within the renovation areas are included as well. Bid packages: Bid Package 02.A - Demolition, Bid Package 03.A - Concrete, Bid Package 04.A - Masonry, Bid Package 05.AA - Structural Steel Supply, Bid Package 05.AB - Structural Steel Erection, Bid Package 06.D - Architectural Woodwork, Bid Package 07.F - Roofing and Metal Panels, Bid Package 07.J - Sealants and Waterproofing, Bid Package 08.A - Doors, Frames, and Hardware Supply, Bid Package 08.F - Aluminum Entrances, Storefronts, and Glazing, Bid Package 09.A - Drywall and Ceilings, Bid Package 09.B - Flooring and Tile, Bid Package 09.H - Painting, Bid Package 10.C - Signage, Bid Package 10.D - Specialties Supply, Bid Package 12.C - Window Treatments, Bid Package 21.A - Fire Suppression, Bid Package 22.A - Plumbing, Bid Package 23.A - HVAC, Bid Package 26.A - Electrical, Bid Package 31.A - Site Work, Bid Package 32.G - Fencing, Bid Package 80.A - General Trades.
Posted Date
Jan 7, 2026
Due Date
Jan 29, 2026
Release: Jan 7, 2026
Close: Jan 29, 2026
The project consists of a security addition and renovation work for Harrah Middle School. The work consists of approx. 640 SF of new build to encapsulate a larger area for the media center. The remainder of the 9,300 SF of work is for complete renovation of the administration, restrooms, and a science classroom. The project also consists of the addition of a large structural steel canopy wrapping a portion of the building providing dry traversing space from the drop off area into the building. Existing MEP upgrades within the renovation areas are included as well. Bid packages: Bid Package 02.A - Demolition, Bid Package 03.A - Concrete, Bid Package 04.A - Masonry, Bid Package 05.AA - Structural Steel Supply, Bid Package 05.AB - Structural Steel Erection, Bid Package 06.D - Architectural Woodwork, Bid Package 07.F - Roofing and Metal Panels, Bid Package 07.J - Sealants and Waterproofing, Bid Package 08.A - Doors, Frames, and Hardware Supply, Bid Package 08.F - Aluminum Entrances, Storefronts, and Glazing, Bid Package 09.A - Drywall and Ceilings, Bid Package 09.B - Flooring and Tile, Bid Package 09.H - Painting, Bid Package 10.C - Signage, Bid Package 10.D - Specialties Supply, Bid Package 12.C - Window Treatments, Bid Package 21.A - Fire Suppression, Bid Package 22.A - Plumbing, Bid Package 23.A - HVAC, Bid Package 26.A - Electrical, Bid Package 31.A - Site Work, Bid Package 32.G - Fencing, Bid Package 80.A - General Trades.
AvailableAddition and renovation at the high school.
Posted Date
Jan 16, 2026
Due Date
Feb 10, 2026
Release: Jan 16, 2026
Close: Feb 10, 2026
Addition and renovation at the high school.
AvailableRelease: Jan 15, 2026
Close: Jan 29, 2026
Renovation of middle school.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →