CityPA
Aug 8, 2026
Closes
Sep 1, 2026
Valley View Drive Stormwater Replacement Project RFP
Replacement of the existing storm water pipe and storm water inlet. New pre-cast concrete and HDPE end walls to be installed.
Description: Construct the forest view bridge, including PCC roadway, structural bridge deck, drainage improvements, and related appurtenances.
City · MO, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityPA
Aug 8, 2026
Closes
Sep 1, 2026
Replacement of the existing storm water pipe and storm water inlet. New pre-cast concrete and HDPE end walls to be installed.
New York State Department of Transportation
State AgencyNY
Jul 2, 2026
Closes
Sep 17, 2026
Bridge replacement. Work consist of furnishing, placing, grading, compacting, and trimming shoulder backup material of the type indicated adjacent to shoulders to the lines, grades, and locations.
CityNY
Aug 6, 2026
Closes
Sep 3, 2026
Work include50 LF 4" pvc watermain; 150 LF 6" pvc watermain; 45 LF 8" pvc watermain; 2,750 LF 12" pvc watermain; 10 EA 12" butterfly valve; 2,000 CY select backfill; 200 LF additional copper tubing; 50 LF concrete curb/gutter; 1,725 SY pavement binder course 4"; 1,725 SY pavement base course 4"; 3,000 LF testing and disinfection; 200 LF 6" pvc watermain; 2,300 LF 12" pvc watermain; 25 LF 16" pvc watermain.
CityVA
Aug 7, 2026
Closes
Sep 18, 2026
The City of Charlottesville is requesting bids under IFB 27-20 for the full replacement of the existing Dairy Road Bridge over the Route 250 Bypass. The project is funded through the State of Good Repair program using state and federal funds, and requires the contractor to provide all supervision, equipment, labor, and materials. Bids are due September 18, 2026, at 2:00 p.m. Eastern Time, with substantial completion required by February 29, 2028, and final completion by May 15, 2028.
Decision makers connected to this RFP from City of Warson Woods.