Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remodeling of existing bathrooms in all 6B suites at Foothill 6 bathrooms (Type A), in which demolition has already been completed, with new bathrooms. In all 7A suites at Foothill 7 bathrooms (Type B), demolish and remove all existing walls and floor finishes down to studs and subfloor including removing subfloor 4 feet back from toilet and tub/shower walls. Furnish and install new bathroom. site protection of all areas of the building including exterior stairs and landscaping. Fixtures that are going to be salvaged for re-use are to be placed on site. Provide protection in the suite bedrooms. All demolition debris is to be removed and disposed of properly with all documentation completed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Locklin Technical College Bldg. 2: Administration energy upgrades.
Posted Date
Jan 2, 2026
Due Date
Jan 29, 2026
Release: Jan 2, 2026
Close: Jan 29, 2026
Locklin Technical College Bldg. 2: Administration energy upgrades.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Structure berm repairs and riprap scour protection.
Posted Date
Jan 15, 2026
Due Date
Feb 2, 2026
Release: Jan 15, 2026
Close: Feb 2, 2026
Structure berm repairs and riprap scour protection.
AvailableWork includes installation of new steel handrails and mid-rails on the catwalk of the second structure of the delaware memorial bridge.
Posted Date
Jan 9, 2026
Due Date
Feb 4, 2026
Release: Jan 9, 2026
Close: Feb 4, 2026
Work includes installation of new steel handrails and mid-rails on the catwalk of the second structure of the delaware memorial bridge.
AvailableRelease: Jan 20, 2026
Close: Feb 4, 2026
Roof structure and interior repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →