Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Sciences Po Uc Berkeley Dual Degree's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Assistant Director, Dual Degree Programs
Assistant Director of Dual Degree and Academic Integration
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Sciences Po Uc Berkeley Dual Degree
Memorial stadium monetization opportunities.
Posted Date
Jan 20, 2026
Due Date
Feb 10, 2026
Release: Jan 20, 2026
Sciences Po Uc Berkeley Dual Degree
Close: Feb 10, 2026
Memorial stadium monetization opportunities.
AvailableSciences Po Uc Berkeley Dual Degree
Remodeling of existing bathrooms in all 6B suites at Foothill 6 bathrooms (Type A), in which demolition has already been completed, with new bathrooms. In all 7A suites at Foothill 7 bathrooms (Type B), demolish and remove all existing walls and floor finishes down to studs and subfloor including removing subfloor 4 feet back from toilet and tub/shower walls. Furnish and install new bathroom. site protection of all areas of the building including exterior stairs and landscaping. Fixtures that are going to be salvaged for re-use are to be placed on site. Provide protection in the suite bedrooms. All demolition debris is to be removed and disposed of properly with all documentation completed.
Posted Date
-
Due Date
Feb 12, 2026
Sciences Po Uc Berkeley Dual Degree
Close: Feb 12, 2026
Remodeling of existing bathrooms in all 6B suites at Foothill 6 bathrooms (Type A), in which demolition has already been completed, with new bathrooms. In all 7A suites at Foothill 7 bathrooms (Type B), demolish and remove all existing walls and floor finishes down to studs and subfloor including removing subfloor 4 feet back from toilet and tub/shower walls. Furnish and install new bathroom. site protection of all areas of the building including exterior stairs and landscaping. Fixtures that are going to be salvaged for re-use are to be placed on site. Provide protection in the suite bedrooms. All demolition debris is to be removed and disposed of properly with all documentation completed.
AvailableSciences Po Uc Berkeley Dual Degree
Furnish and install six (6) level 2 and two (2) level 3 vehicle charging stations (EVCS) inclusive of all new electrical infrastructure as shown on project plans. Work includes furnish and install dry-type transformer, switchgear, control panel, concrete foundations, bollards, striping, conduits, and trenching.
Posted Date
-
Due Date
Feb 17, 2026
Release: -
Sciences Po Uc Berkeley Dual Degree
Close: Feb 17, 2026
Furnish and install six (6) level 2 and two (2) level 3 vehicle charging stations (EVCS) inclusive of all new electrical infrastructure as shown on project plans. Work includes furnish and install dry-type transformer, switchgear, control panel, concrete foundations, bollards, striping, conduits, and trenching.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.