The Georgia Department of Transportation is seeking a pre-qualified firm for the demolition and removal of improvements and structures in Dougherty County. The project involves work at 301 East Oglethorpe Blvd and 1621 E. Oglethorpe Blvd in Albany, Georgia. Bidders must be currently listed on the GDOT prequalification listing to be considered for the award.
The Georgia Department of Transportation is seeking a pre-qualified firm for the demolition and removal of improvements and structures in Dougherty County. The project involves work at 301 East Oglethorpe Blvd and 1621 E. Oglethorpe Blvd in Albany, Georgia. Bidders must be currently listed on the GDOT prequalification listing to be considered for the award.
In general, the work consists of the removal and replacement of patient lifts within member/resident rooms and spa/bathing rooms within moses hall, which is an existing four-story concrete, steel and masonry building. Work includes selective demolition of ceilings, walls, and door frames, removal of existing patient lifts and ceiling tracks, installation of new patient lifts and track system, installation of privacy curtains, and patching and re-finishing of ceilings, walls, and door frames affected by the work. Mechanical work will be limited to relocation of diffusers as needed to accommodate new lift tracks. Electrical work will include relocation of light fixtures as needed and power connection to new lift system. The project also includes installing a new patient lift in the physical therapy room.
In general, the work consists of the removal and replacement of patient lifts within member/resident rooms and spa/bathing rooms within moses hall, which is an existing four-story concrete, steel and masonry building. Work includes selective demolition of ceilings, walls, and door frames, removal of existing patient lifts and ceiling tracks, installation of new patient lifts and track system, installation of privacy curtains, and patching and re-finishing of ceilings, walls, and door frames affected by the work. Mechanical work will be limited to relocation of diffusers as needed to accommodate new lift tracks. Electrical work will include relocation of light fixtures as needed and power connection to new lift system. The project also includes installing a new patient lift in the physical therapy room.