FederalDC
Posted
Sep 3, 2026
Sep 23, 2026
Flooring Replacement, Stairwell Pad Upgrades, Door/Frame Painting, and Hallway Wall Repairs (Mississippi State, MS)
The Agricultural Research Service requires construction work at the USDA ARS Crop Science Research Laboratory in Mississippi State, Mississippi, including flooring replacement, stairwell pad upgrades, door and frame painting, and hallway wall repairs. The work includes replacing stone tile with VCT tile, installing black nonslip pads on 83 stair steps, painting metal doors and frames, and repairing and painting walls and hallways across three floors. This is a total small business set-aside under NAICS 236220, with performance required within 120 days after the Notice to Proceed.