Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Village of Elkhart Lake
Project consists of a new municipal building. The new Welcome Center is a 2,198 SF facility that will include a new visitor/tourist lobby area, a conference room, staff offices, staff toilet and break area, mechanical room and toilets for adjacent park use, accessed from the exterior and adjacent plaza to be used for public events. This is only a solicitation for flooring. The work includes providing approx. 200 SF of epoxy resin flooring and approx. 440 SF of epoxy terrazzo flooring work at the new Welcome Center. The work includes epoxy resin flooring at 2 exterior accessed toilet rooms and one exterior accessed storage room. The epoxy terrazzo flooring work will be located within the new lobby space and includes a terrazzo representation. BP 9.4A - Resinous Flooring.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Hendricks County
Construction of welcome center & administrative office. Work includes bid package #1 - general trades; #2 - sitework; #3 - masonry; #4 - structural steel; #5 - framing, drywall & ceilings; #6 - flooring & tiling; #7 - roofing; #8 - painting; #9 - aluminum storefront & glazing; #10 - casework; #11 - plumbing & hvac; #12 - electrical; #13 - landscaping; #14 - asphalt.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Hendricks County
Close: Dec 18, 2025
Construction of welcome center & administrative office. Work includes bid package #1 - general trades; #2 - sitework; #3 - masonry; #4 - structural steel; #5 - framing, drywall & ceilings; #6 - flooring & tiling; #7 - roofing; #8 - painting; #9 - aluminum storefront & glazing; #10 - casework; #11 - plumbing & hvac; #12 - electrical; #13 - landscaping; #14 - asphalt.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Michigan Department of Technology, Management and Budget
The State of Michigan is soliciting professional services to replace the HVAC system at the Port Huron Welcome Center, including design, construction administration, and field services. The contractor must provide a detailed work plan, references, and budget analysis; a mandatory pre-bid meeting is scheduled and proposal close and questions deadlines are provided on the posting.
Posted Date
Nov 20, 2025
Due Date
Jan 8, 2026
Release: Nov 20, 2025
Michigan Department of Technology, Management and Budget
Close: Jan 8, 2026
The State of Michigan is soliciting professional services to replace the HVAC system at the Port Huron Welcome Center, including design, construction administration, and field services. The contractor must provide a detailed work plan, references, and budget analysis; a mandatory pre-bid meeting is scheduled and proposal close and questions deadlines are provided on the posting.
AvailableHendry County
Work includes flooring replacement.
Posted Date
Oct 22, 2025
Due Date
Dec 4, 2025
Release: Oct 22, 2025
Hendry County
Close: Dec 4, 2025
Work includes flooring replacement.
AvailableChannahon Park District
Provide flooring project.
Posted Date
Nov 12, 2025
Due Date
Dec 2, 2025
Release: Nov 12, 2025
Channahon Park District
Close: Dec 2, 2025
Provide flooring project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →