Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists, in general, of: Replacement of existing stormdrain pipe with larger capacity pipes ranging from 24" to 48" diameter; installation of approx. 3,700 LF of new stormdrain pipe ranging from 36" to 42" diameter; new storm drain manholes and junction boxes; new stormdrain outfall headwalls and wingwalls, tide gates, and rock slope protection; grading of new and existing tidal channels; relocation of 6" to 10" diameter gravity sewer lines and associated manholes; raising and lowering sections of water and sewer laterals and lines; procurement and installation of stormwater trash capture devices and a hydrodynamic separator; removal, stockpiling and disposal excavated material; excavation and placement of marsh soils on low-lying marsh lands and hydroseeding.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes perform stream channel restoration to increase flood resiliency.
Posted Date
Dec 23, 2025
Due Date
Jan 15, 2026
Release: Dec 23, 2025
Close: Jan 15, 2026
Work includes perform stream channel restoration to increase flood resiliency.
AvailableSeeking a contractor to provide all materials and labor to the colt railroad resiliency and connectivity project.
Posted Date
Dec 24, 2025
Due Date
Jan 23, 2026
Release: Dec 24, 2025
Close: Jan 23, 2026
Seeking a contractor to provide all materials and labor to the colt railroad resiliency and connectivity project.
AvailableThe buyer seeks a consultant to evaluate and propose alternatives to restore dunes and improve coastal resiliency at Mackerel Cove in Rhode Island. The scope includes developing a study and recommendations to protect local infrastructure and habitat from sea level rise and storm impacts. Proposals are due by January 22, 2026.
Posted Date
Dec 30, 2025
Due Date
Jan 22, 2026
Release: Dec 30, 2025
Close: Jan 22, 2026
The buyer seeks a consultant to evaluate and propose alternatives to restore dunes and improve coastal resiliency at Mackerel Cove in Rhode Island. The scope includes developing a study and recommendations to protect local infrastructure and habitat from sea level rise and storm impacts. Proposals are due by January 22, 2026.
This RFP is for mechanical fuels treatment for a 340-acre fuels reduction project.
Posted Date
-
Due Date
Mar 15, 2026
Close: Mar 15, 2026
This RFP is for mechanical fuels treatment for a 340-acre fuels reduction project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis