Open RFP

Fixed Film Reactor Removal Project

Description: Project includes, but not limited to, dismantling of existing fixed film reactors (trickling filter). All steel and concrete elements need to be removed and transported for recycling. Plastic filter media (testing positive for lead) approx 4,900 CY shall be removed and stacked on site for removal under separate contract, within a double-lined storage area of not less than 22,000 SF, including cover liner and perimeter erosion controls, constructed by the contractor and left in place at completion of the work. Regrade area of fixed film reactor, plus an additional 50 radius to leave the area flat and place a 3-inch lift of 3/4 grey rock of uniform color.

Buyer
City of San Leandro

City · CA, US

Released
-
Closes
Oct 28, 2026(25 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts