Posted
Apr 13, 2026
Sep 25, 2026
Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020
Intake structure and dam rehabilitation.
Description: The U.S. Army Corps of Engineers, Huntington District is soliciting a construction contract for rehabilitation of the intake structure and dam at Fishtrap Lake in Shelbiana, Kentucky. The work is classified under NAICS 237990, Other Heavy and Civil Engineering Construction, and will follow plans and specifications included in the scope of work. This active solicitation requires offers by September 25, 2026, at 11:00 AM EDT.
Federal · WV, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from U.S. Army Engineer District Huntington.
Adjacent opportunities open for bidding right now.
Posted
Apr 13, 2026
Sep 25, 2026
Intake structure and dam rehabilitation.
Posted
-
Sep 17, 2026
The Commonwealth of Kentucky is soliciting bids under RFB-275-26 for rehabilitation of Willisburg Lake Dam in Washington County. The work includes a reinforced-concrete auxiliary spillway with two 8-foot by 16-foot precast concrete culverts, together with related dam rehabilitation and site work. The solicitation requires electronic submission through the Commonwealth’s eProcurement system and is listed with a bid deadline of September 17, 2026, at 1:30 PM ET; it is an RFB construction procurement, not a grant program.
Pennsylvania Department of General Services
State AgencyPA
Posted
Jul 24, 2026
Sep 15, 2026
Dam rehabilitation project.
Posted
Jun 3, 2026
Sep 17, 2026
Work shall include construction of a reinforced concrete auxiliary spillway with two, 8 feet by 16 feet, precast concrete culverts through the dam crest to serve as the spillway inlet with a reinforced concrete stepped chute along the downstream slope that discharges into a reinforced concrete stilling basin at the toe of the dam. A reinforced concrete floodwall with concrete cutoff shall be constructed along the upstream crest of the dam along KY-555 with rockfill placed along the upstream slope of the dam. A rockfill stability berm shall be constructed along the downstream slope. Work further includes a new low-level drawdown valve in the dry well of the riser structure, replacement of the existing low level drawdown valve, and remediation of concrete cracking and seepage in the existing principal spillway culvert. In addition, the City of Springfield’s raw water intake will be abandoned and new raw water intake lines installed within the principal spillway culvert. A Contractor designed Water Diversion Plan is required. The BASE BID Work will also consist of site preparation, erosion and sedimentation control, slope construction and protection, construction access, selective demolition, earthwork, temporary shoring, traffic control and maintenance, storm drainage, and site grading and restoration work. Demolition Work shall include demolition of existing storm sewer infrastructure, raw water lines, concrete ditches, KY 555 within the footprint of the new auxiliary spillway, existing valves and operators at the intake structure, partial demolition of the principal spillway culvert and wingwalls, and abandonment of existing embankment piezometers. The CONTRACTOR’s Work shall also include site safety, water control, site security, traffic control, and site cleanup.