Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project involves the replacement of an existing generator at the First Hill Booster Station, including its removal, installation of a new generator, replacement of electrical components (ATS, conduit, wiring), fuel tank installation, concrete work, HVAC, piping, insulation, lighting, and landscaping.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project scope includes, but is not limited to, removal and replacement of backup generator.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
Close: Jan 8, 2026
Project scope includes, but is not limited to, removal and replacement of backup generator.
AvailableHoward street generator replacement project. Bid Group #1, Bid Package #1 - Electrical.
Posted Date
Dec 17, 2025
Due Date
Jan 8, 2026
Release: Dec 17, 2025
Close: Jan 8, 2026
Howard street generator replacement project. Bid Group #1, Bid Package #1 - Electrical.
AvailableWork consists of generator replacement project. Provide a full replacement and upgrade the existing primary power distribution (main switchboard). Scope includes decommissioning of the existing emergency generator, selective demolition of unused conductors and conduit, fuel pumps, exhaust pipes, disposal of oil, fuel and any other chemicals.
Posted Date
Aug 22, 2025
Due Date
Jan 9, 2026
Release: Aug 22, 2025
Close: Jan 9, 2026
Work consists of generator replacement project. Provide a full replacement and upgrade the existing primary power distribution (main switchboard). Scope includes decommissioning of the existing emergency generator, selective demolition of unused conductors and conduit, fuel pumps, exhaust pipes, disposal of oil, fuel and any other chemicals.
AvailableGenerator controls replacement.
Posted Date
Dec 8, 2025
Due Date
Feb 11, 2026
Release: Dec 8, 2025
Close: Feb 11, 2026
Generator controls replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis