Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Howard street generator replacement project. Bid Group #1, Bid Package #1 - Electrical.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of generator replacement project. Provide a full replacement and upgrade the existing primary power distribution (main switchboard). Scope includes decommissioning of the existing emergency generator, selective demolition of unused conductors and conduit, fuel pumps, exhaust pipes, disposal of oil, fuel and any other chemicals.
Posted Date
Aug 22, 2025
Due Date
Jan 9, 2026
Release: Aug 22, 2025
Close: Jan 9, 2026
Work consists of generator replacement project. Provide a full replacement and upgrade the existing primary power distribution (main switchboard). Scope includes decommissioning of the existing emergency generator, selective demolition of unused conductors and conduit, fuel pumps, exhaust pipes, disposal of oil, fuel and any other chemicals.
Premium
Access the largest public sector contact database
Work includes removal and replacement of curb, gutter, sidewalk, and drive approaches; tree root removal; removal and replacement of ada pedestrian curb ramps; cold planing; full pavement reconstruction/regrading; adjustment of water valve covers to grade; adjustment of sewer manholes and cleanouts to grade; road culvert drainage system; traffic signing, striping and stenciling; street lighting; landscape and irrigation; and street sweeping.
Posted Date
Nov 17, 2025
Due Date
Dec 23, 2025
Release: Nov 17, 2025
Close: Dec 23, 2025
Work includes removal and replacement of curb, gutter, sidewalk, and drive approaches; tree root removal; removal and replacement of ada pedestrian curb ramps; cold planing; full pavement reconstruction/regrading; adjustment of water valve covers to grade; adjustment of sewer manholes and cleanouts to grade; road culvert drainage system; traffic signing, striping and stenciling; street lighting; landscape and irrigation; and street sweeping.
AvailableThe contract consists of providing all labor, equipment and materials necessary to supply and install a new standby emergency power system at the farmington police station including, but not limited to, automatic transfer switch, manual transfer switch, and new standby generator assembly. The existing generator is to remain and be integrated into the overall emergency power system. Additive alternate no. 1 includes installation of a precast concrete above- ground fuel storage tank and associated fuel piping for interconnection into the existing generator.
Posted Date
Dec 6, 2025
Due Date
Dec 30, 2025
Release: Dec 6, 2025
Close: Dec 30, 2025
The contract consists of providing all labor, equipment and materials necessary to supply and install a new standby emergency power system at the farmington police station including, but not limited to, automatic transfer switch, manual transfer switch, and new standby generator assembly. The existing generator is to remain and be integrated into the overall emergency power system. Additive alternate no. 1 includes installation of a precast concrete above- ground fuel storage tank and associated fuel piping for interconnection into the existing generator.
AvailableProcurement of labor, equipment, and materials for the supply and installation of a new standby emergency power system at the Farmington Police Station, including automatic and manual transfer switches, and a new standby generator assembly. Integration of the existing generator and an additive alternate for a precast concrete fuel storage tank and associated piping are also included.
Posted Date
-
Due Date
Dec 30, 2025
Close: Dec 30, 2025
Procurement of labor, equipment, and materials for the supply and installation of a new standby emergency power system at the Farmington Police Station, including automatic and manual transfer switches, and a new standby generator assembly. Integration of the existing generator and an additive alternate for a precast concrete fuel storage tank and associated piping are also included.